DSP Meeting Results, 2010-2014

Below are the results of the 2010-2014 MSBA's Designer Selection Panel meetings. The results are displayed in descending order, starting with the results of the most recent DSP meeting.

DSP Meeting Results:

Meeting Date: December 23, 2014

Billerica Memorial High School, Billerica, MA

Applications review at the Tuesday, December 23, 2014 DSP meeting resulted in the following unranked list of applicants:

  • Dore & Whittier Architects, Inc.
  • Perkins + Will
  • Symmes Maini & McKee Associates, Inc.

Interviews for the proposed Billerica Memorial High School project will be held on Tuesday, January 13, 2015. 

A presentation for an informational interview at this meeting was from the following firm:

  • TBA Architects, Inc.

Meeting Date: December 9, 2014

Carver Elementary School, Carver, MA   

Applications review at the Tuesday, November 18, 2014 DSP meeting and finalist interviews at the Tuesday, December 9, 2014 meeting resulted in the following ranking of applicants:

  1. HMFH Architects, Inc.
  2. Perkins + Will
  3. Flansburgh Associates, Inc.

The next meeting of the Panel will be held on Tuesday, December 23, 2014.


Meeting Date: November 18, 2014

Carver Elementary School, Carver, MA

Applications review at the Tuesday, November 18, 2014 DSP meeting resulted in the following unranked list of applicants:

  • Design Partnership of Cambridge, Inc.
  • Flansburgh Associates, Inc.
  • HMFH Architects, Inc.
  • Perkins + Will

Interviews for the proposed Carver Elementary School project will be held on Tuesday, December 9, 2014.


Meeting Date: October 21, 2014

Center Elementary School, Hopkinton, MA

Applications review at the Tuesday, October 7, 2014 DSP meeting and finalist interviews at the Tuesday, October 21, 2014 resulted in the following ranking of applicants:

  1. Drummey Rosane Anderson, Inc.
  2. OMR Architects, Inc.
  3. JCJ Architecture, PC

Meeting Date: October 7, 2014

Center Elementary School, Hopkinton, MA  

Applications review at the Tuesday, October 7, 2014 DSP meeting resulted in the following unranked list of applicants:

  • Drummey Rosane Anderson, Inc.
  • JCJ Architecture, PC
  • OMR Architects, Inc.

Interviews for the proposed Center Elementary School project will be held on Tuesday, October 21, 2014.

West Street Elementary School, Granby, MA

Applications review at the Tuesday, October 7, 2014 DSP meeting resulted in the following ranking of applicants:

  1. Jones Whitsett Architects, Inc.
  2. OMR Architects, Inc.
  3. Dore & Whittier Architects, Inc.

Meeting Date: September 23, 2014

Cabot Elementary School, Newton, MA

Applications review at the September 9, 2014 DSP meeting and finalist interviews at the September 23, 2014 DSP meeting resulted in the following ranking of applicants:

  1. DiNisco Design Partnership Limited
  2. Design Partnership of Cambridge, Inc.
  3. Tappè Associates, Inc.

The next meeting of the Designer Selection Panel will be on Tuesday, October 7, 2014. 
 


Meeting Date: September 9, 2014

Early Childhood Education Center, Dedham, MA 

Applications review at the Tuesday, August 12, 2014 DSP meeting and interviews at the September 9, 2014 DSP meeting resulted in the following ranking of applicants:

  1. Knight, Bagge & Anderson, Inc.
  2. DiNisco Design Partnership, Limited
  3. Studio G Architects, Inc.

Cabot Elementary School, Newton, MA

Applications review at the September 9, 2014 DSP meeting resulted in the following unranked list of applicants:

  • Design Partnership of Cambridge, Inc.
  • DiNisco Design Partnership Limited
  • Tappè Associates, Inc.

Interviews for the Cabot Elementary School, Newton, MA will be held at the next Designer Selection Panel meeting on Tuesday, September 23, 2014.
 


Meeting Date:  August 26, 2014

John Hannigan Elementary School, New Bedford, MA

Applications review at the Tuesday, August 12, 2014 DSP meeting and finalist interviews at the Tuesday, August 26, 2014 DSP meeting resulted in the following ranking of applicants:

  1. Turowski2 Architecture, Inc.
  2. Mount Vernon Group Architects, Inc.
  3. Raymond Design Associates, Inc.

Briscoe Middle School, Beverly, MA

Applications review at the Tuesday, August 12, 2014 DSP meeting and finalist interviews at the Tuesday, August 26, 2014 DSP meeting resulted in the following ranking of applicants:

  1. Ai3 Architects LLC
  2. Symmes Maini & McKee Associates, Inc.
  3. Design Partnership of Cambridge, Inc.

The next meeting of the Panel will be held on Tuesday, September 9, 2014.


Meeting Date: August 12, 2014 

Briscoe Middle School, Beverly, MA

Applications review at the Tuesday, August 12, 2014 DSP meeting resulted in the following unranked list of applicants:

  • Ai3 Architects, LLC
  • Design Partnership of Cambridge, Inc.
  • Symmes Maini & McKee Associates, Inc.

Interviews for the proposed Briscoe Middle School project will be held on Tuesday, August 26, 2014.

John Hannigan Elementary School, New Bedford, MA

Applications review at the Tuesday, August 12, 2014 DSP meeting resulted in the following unranked list of applicants:

  • Mount Vernon Group Architects, Inc.
  • Raymond Design Associates, Inc.
  • Turowski2 Architecture, Inc.

Interviews for the proposed John Hannigan Elementary School project will be held on Tuesday, August 26, 2014.

Early Childhood Education Center, Dedham, MA

Applications review at the Tuesday, August 12, 2014 DSP meeting resulted in the following unranked list of applicants:

  • DiNisco Design Partnership, Limited
  • Knight, Bagge & Anderson, Inc.
  • Studio G. Architects, Inc.

Interviews for the proposed Early Childhood Education Center project will be held on Tuesday, September 9, 2014.
 


Meeting Date: April 22, 2014

There were no application reviews.

Presentations for informational interviews at this meeting were from the following firms:

  • DHK Architects, Inc.
  • Reinhardt Associates, Inc.
  • LLB Architects
  • Dietz & Company
  • Perkins Eastman

The Tuesday, May 6, 2014 DSP meeting has been cancelled.
 


Meeting Date: February 25, 2014

Wyman – Hurld Elementary School, Woburn, MA

Applications review at the Tuesday, February 11, 2014 DSP meeting and finalist interviews at the Tuesday, February 25, 2014 DSP meeting resulted in the following ranking of applicants:

  1. DiNisco Design Partnership, Ltd.
  2. Knight Bagge & Anderson, Inc.
  3. Perkins + Will

The Tuesday, March 11, 2014 DSP meeting has been cancelled.
 


Meeting Date:  February 11, 2014

Wyman – Hurld Elementary School, Woburn, MA

Applications review at the Tuesday, February 11, 2014 DSP meeting resulted in the following unranked list of applicants:

  • DiNisco Design Partnership, Ltd.
  • Knight Bagge & Anderson, Inc.
  • OMR Architects, Inc.
  • Perkins + Will

Interviews for the proposed Wyman-Hurld project will be held on Tuesday, February 25, 2014 at 8:30 AM.
 


 
Meeting Date: January 14, 2014

Taconic High School, Pittsfield, MA

Applications review at the Tuesday, December 17, 2013 DSP meeting and finalist interviews at the Tuesday, January 14, 2014 DSP meeting resulted in the following ranking of applicants:

  1. Drummey Rosane Anderson, Inc.
  2. Kaestle Boos Associates, Inc.
  3. Dore & Whittier Architects, Inc.

The Tuesday, January 28, 2014 Designer Selection Panel meeting has been cancelled.  The next meeting of the Panel will be held on Tuesday, February 11, 2014.


DSP Meeting Results:

Meeting Date:  December 17, 2013

Taconic High School, Pittsfield, MA 

Applications review at the Tuesday, December 17, 2013 DSP meeting resulted in the following unranked list of applicants:

  • Dore & Whittier Architects, Inc.
  • Drummey Rosane Anderson, Inc.
  • Kaestle Boos Associates, Inc.

Interviews for the Taconic High School, Pittsfield, MA will be held at the next scheduled Designer Selection Panel meeting on Tuesday, January 14, 2014.

 


 
DSP Meeting Results:

Meeting Date:  November 19, 2013

Gates Intermediate School, Scituate, MA

Applications review at the November 5, 2013 DSP meeting and finalist interviews at the November 19, 2013 DSP meeting resulted in the following ranking of applicants:

  1. Dore & Whittier Architects, Inc.
  2. Design Partnership of Cambridge, Inc.
  3. Drummey Rosane Anderson, Inc.

Please note that the Tuesday, December 3, 2013 DSP Meeting has been canceled.

The next meeting of the DSP is scheduled for Tuesday, December 17, 2013.
 


DSP Meeting Results:

Meeting Date:  November 5, 2013

Nelson Place School, Worcester, MA

Applications review at the Tuesday, October 22, 2013 DSP meeting and finalist interviews at the Tuesday, November 5, 2013 DSP meeting resulted in the following ranking of applicants:

  1. Lamoureux Pagano & Associates, Inc.
  2. Perkins Eastman
  3. Flansburgh Associates, Inc.

Gates Intermediate School, Scituate, MA

Applications review at the November 5, 2013 DSP meeting resulted in the following unranked list of applicants:

  • Design Partnership of Cambridge, Inc.
  • Dore & Whittier Architects, Inc.
  • Drummey Rosane Anderson, Inc.
  • Miller Dyer Spears, Inc.

Interviews for the Gates Intermediate School, Scituate, MA will be held at the next scheduled Designer Selection Panel meeting on Tuesday, November 19, 2013.


DSP Meeting Results:

Meeting Date:  October 22, 2013

Nelson Place School, Worcester, MA

Applications review at the Tuesday, October 22, 2013 DSP meeting resulted in the following unranked list of applicants:

  • Flansburgh Associates, Inc.
  • Lamoureux Pagano & Associates, Inc.
  • OMR Architects, Inc.
  • Perkins Eastman

Interviews for the Nelson Place School will be held at the next scheduled DSP meeting on November 5, 2013.

There were informational interviews with the following firms:

  • Kennedy & Violich Architecture, Ltd.
  • Diversified Technology Consultants, Inc.

The next meeting of the DSP will be held on Tuesday, November 5, 2013.


DSP Meeting Results:

Meeting Date:  August 20, 2013

Sarah W. Gibbons Middle School, Westborough, MA 

Applications review at the Tuesday, July 9, 2013 DSP meeting and finalist interviews at the Tuesday, August 20, 2013 meeting resulted in the following ranking of applicants:

  1. Habeeb & Associates Architects, Inc.
  2. Turowski2 Architecture, Inc.
  3. Tetra Tech Architects & Engineers

The next meeting of the DSP scheduled for Tuesday, September 10, 2013 has been canceled.


DSP Meeting Results:

Meeting Date:  July 23, 2013

Accelerated Repair Designer Applications Review

Applications review resulted in the following recommendation of applicants for the Accelerated Repair Program:

Roof, Windows, and Boilers
Baker/Wohl Architects
CGKV Architects, Inc.
CSS Architects, Inc.
Dietz & Co. Architects, Inc.
Habeeb & Associates Architects
Icon Architecture, Inc.
S/L/A/M Collaborative
Taylor & Burns
Tighe & Bond
 
Roof and Window Only
CBI Consulting, Inc.
Civitects
Gale Associates, Inc.
Raymond Design Associates, Inc.
Russo Barr Associates, Inc.
 
Boiler Only
Consulting Engineering Services LLC
Hesnor Engineering
RDK Engineers
Shekar & Associates

The MSBA will assign a Designer from one of the above three groups to each Accelerated Repair project. There is no guarantee that a Designer in any of the above three groups will be assigned to any particular number of Accelerated Repair projects or to any Accelerated Repair project at all. The MSBA may assign more than one Accelerated Repair project to a Designer. The grouping and selection of Designers described above is solely for the purposes of the Accelerated Repair Program.

Plymouth South High School, Plymouth, MA

Applications review at the July 23, 2013 DSP meeting resulted in the following ranking of applicants:

  1. Ai3 Architects LLC
  2. Drummey Rosane Anderson, Inc.
  3. Mount Vernon Group Architects, Inc.

The Tuesday, August 6, 2013 Designer Selection Panel meeting has been cancelled.

The next scheduled meeting of the Panel will held on Tuesday, August 20, 2013.


DSP Meeting Results:

Meeting Date:  July 9, 2013

Edward Devotion School, Brookline, MA 

Applications review at the June 25, 2013 DSP meeting and finalist interviews at the July 9, 2013 meeting resulted in the following ranking of applicants:

  1. HMFH Architects, Inc.
  2. Flansburgh Associates, Inc.

Sarah W. Gibbons Middle School, Westborough, MA

After the DSP voted to accept the withdrawal of the application submitted by Fletcher Thompson Architecture Engineering, LLC, the panel unanimously voted to interview the three remaining applicants for the proposed project.  Interviews will be with the following applicants:

  • Habeeb & Associates Architects, Inc.
  • Tetra Tech Architects & Engineers
  • Turowski2 Architecture, Inc.

Interviews for the Sarah W. Gibbons Middle School will be held on Tuesday, August 20, 2013.

MSBA Staff Presentation on Construction Cost Data and Change Order Data

MSBA staff gave a presentation which provided an overview of cost data and change order data.  The presentation is summarized as follows:

The Director of Project Management reviewed the cost data analysis that the MSBA has performed.  This analysis demonstrates that construction costs have remained relatively stable and that current MSBA funding levels continue to be appropriate.  The MSBA plans to monitor cost data annually. 

An MSBA Senior Project Manager from the Construction Administration Team provided an update on a change order data analysis that was undertaken by staff, including a review of the data, methodology of analysis, and preliminary findings. For additional information view the presentation.

The next meeting of the DSP will be held on Tuesday, July 23, 2013.


Meeting Date: June 25, 2013

Hadley Elementary School, Swampscott, MA

Applications review at the June 25, 2013 DSP meeting resulted in the following ranking of applicants:

  1. Mount Vernon Group Architects, Inc.
  2. Symmes Maini & McKee Associates, Inc.

Edward Devotion School, Brookline, MA

Applications review at the June 25, 2013 DSP meeting resulted in the following unranked list of applicants:

  • Flansburgh Associates, Inc.
  • HMFH Architects, Inc.

Interviews for the Edward Devotion School (Brookline, MA) will be held on Tuesday, July 9, 2013.

The next scheduled meeting of the Panel will be held on Tuesday, July 9, 2013.


DSP Meeting Results:

Meeting Date: May 7, 2013

Clark Avenue Middle School – Chelsea, MA

Applications review at the April 9, 2013 DSP meeting and interviews at the May 7, 2013 DSP meeting resulted in the following ranking of applicants:

  1. HMFH Architects, Inc.
  2. Mount Vernon Group Architects, Inc.
  3. Flansburgh Associates, Inc.

Caleb Dustin Hunking Middle School Haverhill, MA

Applications review at the April 9, 2013 DSP meeting and interviews at the May 7, 2013 DSP meeting resulted in the following ranking of applicants:

  1. JCJ Architecture, PC
  2. Design Partnership of Cambridge, Inc.
  3. Dore & Whittier Architects, Inc.

There will not be a DSP meeting on Tuesday, May 21, 2013.
The next scheduled meeting of the Panel will be held on Tuesday, June 11, 2013.
 


DSP Meeting Results:

Meeting Date: April 23, 2013

Holbrook Junior-Senior High School Holbrook, MA

Applications review at the April 9, 2013 DSP meeting and interviews at the April 23, 2013 DSP meeting resulted in the following ranking of applicants:

  1. Flansburgh Associates, Inc.
  2. Drummey Rosane Anderson, Inc.
  3. Kaestle Boos Associates, Inc.

Lincoln Street Elementary School Northborough, MA

Applications review at the April 23, 2013 DSP meeting resulted in the following ranking of applicants:

  1. Lamoureux Pagano & Associates, Inc.
  2. Miller Dyer Spears, Inc.
  3. Kaestle Boos Associates, Inc.

The next scheduled meeting of the Panel will be held on Tuesday, May 7, 2013.



DSP Meeting Results:

Meeting Date: April 9, 2013

Holbrook Junior-Senior High School Holbrook, MA 

Applications review at the April 9, 2013 DSP meeting resulted in the following unranked list of applicants:

  • Drummey Rosane Anderson, Inc.
  • Flansburgh Associates, Inc.
  • Kaestle Boos Associates, Inc.

Interviews for the Holbrook Junior-Senior High School project will take place at the Tuesday, April 23, 2013 DSP meeting.

Clark Avenue Middle School Chelsea, MA

Applications review at the April 9, 2013 DSP meeting resulted in the following unranked list of applicants:

  • Flansburgh Associates, Inc.
  • HMFH Architects, Inc.
  • Mount Vernon Group Architects, Inc.

Interviews for the Clark Avenue Middle School project will take place at the Tuesday, May 7, 2013 DSP meeting.

Caleb Dustin Hunking Middle School – Haverhill, MA 

Applications review at the April 9, 2013 DSP meeting resulted in the following unranked list of applicants:

  • Design Partnership of Cambridge, Inc.
  • Dore & Whittier Architects, Inc.
  • JCJ Architecture, PC

Interviews for the Caleb Dustin Hunking Middle School project will take place at the Tuesday, May 7, 2013 DSP meeting.



DSP Meeting Results:

Meeting Date: March 5, 2013

Minuteman Regional Vocational Technical School Lexington, MA

Applications review at the February 19, 2013 DSP meeting and finalist interviews at the March 5, 2013 DSP resulted in the following ranking of applicants:

  1. Lamoureux Pagano & Associates, Inc.
  2. Kaestle Boos Associates, Inc.
  3. Drummey Rosane Anderson, Inc.

Woodland Elementary School Milford, MA

Applications review at the March 5, 2013 DSP meeting resulted in the following ranking of applicants:

  1. HMFH Architects, Inc.
  2. Symmes Maini & McKee Associates, Inc.
  3. Perkins Eastman

Lincoln Street Elementary School Northborough, MA

Review of the Request for Designer Services resulted in the District’s decision to revise and re-advertise the RFS.

There were no informational interviews at this meeting.



DSP Meeting Results:

Meeting Date: February 19, 2013

North Middlesex Regional High School Townsend, MA

Applications review at the January 22, 2013 DSP meeting and finalist interviews at the February 19, 2013 DSP meeting resulted in the following ranking:

  1. Symmes Maini & McKee Associates, Inc.
  2. Design Partnership of Cambridge, Inc.
  3. Flansburgh Associates, Inc.

Minuteman Regional Vocational Technical School Lexington, MA

Applications review at the February 19, 2013 DSP meeting resulted in the following unranked list of applicants:

  • Drummey Rosane Anderson, Inc.
  • Kaestle Boos Associates, Inc.
  • Lamoureux Pagano & Associates, Inc.

There were no informational interviews at this meeting.

Interviews for the Minuteman Regional Vocational High School project are scheduled for the next DSP meeting on Tuesday, March 5, 2013.



DSP Meeting Results:

Meeting Date: February 5, 2013

Lunenburg High School – Lunenburg, MA

Applications review at the January 8, 2013 DSP meeting and finalist interviews at the February 5, 2013 DSP meeting resulted in the following ranking:

  1. Tappé Associates, Inc. 
  2. Symmes Maini & McKee Associates, Inc.
  3. Ai3 Architects LLC

West Parish Elementary School – Gloucester, MA

Applications review at the February 5, 2013 DSP meeting resulted in the following ranking of applicants:

  1. Dore & Whittier Architects, Inc.
  2. Flansburgh Associates, Inc.
  3. Perkins Eastman

There were no informational interviews at this meeting.



DSP Meeting Results:

Meeting Date: January 22, 2013

Abington, MA – Frolio Middle School

Applications review at the January 8, 2013 DSP meeting and finalist interviews at the January 22, 2013 DSP meeting resulted in the following ranking of applicants:

  1. Ai3 Architects LLC
  2. Design Partnership of Cambridge, Inc.
  3. Flansburgh Associates, Inc.

North Middlesex Regional High School, Townsend, MA

Applications review at the January 22, 2013 DSP meeting resulted in the following unranked list of applicants:

  • Design Partnership of Cambridge, Inc.
  • Flansburgh Associates, Inc.
  • Symmes Maini& McKee Associates, Inc.

There will be interviews for the North Middlesex Regional High School, Townsend, MA at the Tuesday, February 19, 2013 DSP meeting.

There were no informational interviews at this meeting.



DSP Meeting Results:

Meeting Date: January 8, 2013

Boston, MA – Dearborn School

Applications review at the December 18, 2012 DSP meeting and finalist interviews at the January 8, 2013 DSP meeting resulted in the following ranking:

  1. Jonathan Levi Architects LLC
  2. Leers Weinzapfel Associates Architects, Inc.
  3. Symmes Maini & McKee Associates, Inc.

Abington, MA – Frolio Middle School

Applications review at the January 8, 2013 DSP meeting resulted in the following unranked list of applicants:

  • Ai3 Architects LLC
  • Design Partnership of Cambridge, Inc.
  • Flansburgh Associates, Inc.

There will be interviews for the Frolio Middle School, Abington, MA at the Tuesday, January 22, 2013 DSP meeting.

Lunenburg, MA – Lunenburg High School

Applications review at the January 8, 2013 DSP meeting resulted in the following unranked list of applicants:

  • Ai3 Architects LLC
  • Symmes Maini & McKee Associates, Inc.
  • Tappé Associates, Inc.

There will be interviews for the Lunenburg High School, Lunenburg, MA at the Tuesday, February 5, 2013 DSP meeting.

There were no informational interviews at this meeting.


DSP Meeting Results:

Meeting Date: December 18, 2012

Boston, MA – Dearborn School

Applications review at the December 18, 2012 DSP meeting resulted in the following unranked list of applicants:

  • Jonathan Levi Architects LLC
  • Leers Weinzapfel Associates Architects, Inc.
  • Symmes Maini & McKee Associates, Inc.

There will be interviews for the Dearborn School, Boston, MA at the Tuesday, January 8, 2013 DSP meeting.

There were no informational interviews at this meeting.


DSP Meeting Results:

Meeting Date: October 16, 2012

Athol-Royalston Regional School District – Riverbend Elementary School

Applications review at the October 2, 2012 DSP meeting and finalist interviews at the October 16, 2012 DSP meeting resulted in the following ranking of applicants:

  1. Mount Vernon Group Architects, Inc.
  2. Flansburgh Associates, Inc.
  3. OMR Architects, Inc.

There were no informational interviews at this meeting.


DSP Meeting Results:

Meeting Date: October 2, 2012

Newton, MA –  A.E. Angier Elementary School

Applications review at the September 18, 2012 DSP meeting and finalist interviews at the October 2, 2012 DSP meeting resulted in the following ranking of applicants:

  1. DiNisco Design Partnership, Limited
  2. HMFH Architects, Inc.
  3. Mount Vernon Group Architects, Inc. (as determined at the September 18, 2012 DSP meeting)

Athol-Royalston Regional School District – Riverbend Elementary School

Applications review at the October 2, 2012 DSP meeting resulted in the following unranked list of applicants:

  • Flansburgh Associates, Inc.
  • Mount Vernon Group Architects, Inc.
  • OMR Architects, Inc.

There will be interviews for the proposed Riverbend Elementary School, Athol, MA at the Tuesday, October 16, 2012 DSP meeting.

There were no informational interviews at this meeting.


DSP Meeting Results:

Meeting Date: September 18, 2012

Newton – A.E. Angier Elementary School

Applications review at the September 18, 2012 DSP meeting resulted in the following unranked list of applicants:

  • DiNisco Design Partnership, Ltd.
  • HMFH Architects, Inc.

There will be interviews for the A.E. Angier Elementary School project at the Tuesday, October 2, 2012 meeting.

There were no informational interviews at this meeting. 


DSP Meeting Results: 

Meeting Date: August 28, 2012

Lynn, MA – Thurgood Marshall Middle School

Applications review at the July 24, 2012 DSP meeting and Finalist Interviews at the August 28, 2012 DSP meeting resulted in the following ranking of applicants:

  1. Raymond Design Associates, Inc.
  2. Tappé Associates, Inc.
  3. Mount Vernon Group Architects, Inc.

DSP Meeting Results:

Meeting Date: July 24, 2012

Lynn, MA – Thurgood Marshall Middle School

Applications review at the July 24, 2012 DSP meeting resulted in the following unranked list of applicants:

  • Raymond Design Associates, Inc.
  • Tappé Associates, Inc.

There will be interviews for the proposed Thurgood Marshall Middle School project at the Tuesday, August 28, 2012 DSP meeting.

There were informational interviews with the following firms:

  • Stantec
  • Tai Soo Kim Partners Architects

DSP Meeting Results:

Meeting Date: June 5, 2012

Accelerated Repair Designer Applications Review

Applications review resulted in the following recommendation of applicants for the Accelerated Repair Program:

Roof, Window, and Boiler
CSS Architects, Inc.
DiMarinisi & Wolfe Architects
Habeeb & Associates Architects, Inc.
Icon Architecture, Inc.
Knight, Bagge & Anderson, Inc.
Reinhardt Associates, Inc.
Turowski2 Architecture, Inc.

Roof and Window Only
CBI Consulting, Inc.
Gale Associates, Inc.
Kaestle Boos Associates, Inc.
Raymond Design Associates, Inc.
Russo Barr Associates, Inc.

Boiler Only
BLW Engineers, Inc.
Garcia Galuska DeSousa, Inc.
Lindgren & Sharples, P.C.
RDK Engineers
Shekar & Associates

The MSBA will assign a Designer from one of the above three groups to each Accelerated Repair project. There is no guarantee that a Designer in any of the above three groups will be assigned to any particular number of Accelerated Repair projects or to any Accelerated Repair project at all. The MSBA may assign more than one Accelerated Repair project to a Designer. The grouping and selection of Designers described above is solely for the purposes of the Accelerated Repair Program.


DSP Meeting Results:

Meeting Date: May 22, 2012

Winthrop, MA – Winthrop High School

Applications review at the May 22, 2012 DSP meeting resulted in the following ranking of applicants:

  1. HMFH Architects, Inc.
  2. DiNisco Design Partnership, Ltd.
  3. Flansburgh Associates, Inc.

There were no informational interviews.


DSP Meeting Results:

Meeting Date: May 8, 2012

Science Laboratory Initiative

Applications review at the May 8, 2012 DSP meeting resulted in the following grouping of applicants for the Science Laboratory Initiative:
 
Group A
Ai3 Architects, LLC
DiNisco Design Partnership, Ltd.
Flansburgh Associates, Inc.
Kaestle-Boos Associates, Inc.
Lamoureux Pagano Associates, Inc.
Symmes Maini & McKee Associates
 
Group B
Design Partnership of Cambridge, Inc.
Mount Vernon Group Architects, Inc.
Tappé Associates, Inc.
 
Group C
Cannon Design
DAI, Inc.
Habeeb & Associates, Inc.
JCJ Architecture, PC
Knight, Bagge & Anderson, Inc.
Lavallee Brensinger Architects
Raymond Design Associates, Inc.
Richard D. Kimball Company, Inc.
Tetra Tech Architects & Engineers
The S/L/A/M Collaborative
 
In addition, the DSP voted unanimously to disqualify the following applicants as it was determined that their submissions were non-responsive to the requirements of the Request for Services:
 
CSS Architects, Inc.
Edward Rowse Architects, Inc.
Watermark Environmental, Inc.
 
MSBA staff will assign a Designer to each Science Laboratory Initiative (SLI) project. In assigning Designers to SLI projects, the MSBA will first consider the Designers in Group A. If at any time the MSBA believes that the designer resources available in Group A cannot fulfill the objectives of the SLI, the MSBA may assign a Designer from Group B. If at any time the MSBA believes that the designer resources available in Group A and Group B cannot fulfill the objectives of the SLI, the MSBA may assign a Designer from Group C. There is no guarantee that a Designer in any of the three groups will be selected for any SLI project. The MSBA may assign more than one SLI project to a Designer. The grouping and selection of Designers described above is solely for purposes of the SLI.
 

DSP Meeting Results:

Meeting Date: April 24, 2012

Revere, MA – William McKinley Elementary School

Applications review at the April 24, 2012 DSP meeting resulted in the following ranking of applicants:

  1. Drummey Rosane Anderson, Inc.
  2. Flansburgh Associates, Inc.
  3. JCJ Architecture, PC

There were informational interviews with the following firms:

  • Raymond Design Associates, Inc.
  • HKT Architects, Inc.

DSP Meeting Results:

Meeting Date: March 27, 2012

Wachusett Regional School District – Mountview Middle School

Applications review at the March 27, 2012 DSP meeting resulted in the following ranking of applicants:

  1. Lamoureux Pagano & Associates, Inc.
  2. Flansburgh Associates, Inc.
  3. Design Partnership of Cambridge, Inc.

There were informational interviews with the following firms:

  • LaVallee Brensinger Architects
  • Clarke & Green, Inc.

DSP Meeting Results:

Meeting Date: March 13, 2012

Spencer-East Brookfield Regional School District – David Prouty High School

Applications review at the February 28, 2012 DSP meeting and interviews at the March 13, 2012 DSP meeting resulted in the following ranking of applicants:

  1. Design Partnership of Cambridge, Inc.
  2. ARC/Architectural Resources Cambridge, Inc. 
  3. Lamoureux Pagano & Associates, Inc. (as determined at the Feb. 28, 2012 DSP meeting)

Berkshire Hills Regional School District – Monument Mountain Regional High School

Applications review at the February 28, 2012 DSP meeting and interviews at the March 13, 2012 resulted in the following ranking of applicants: 

  1. Symmes Maini & McKee Associates, Inc.
  2. Tetra Tech Architects & Engineers
  3. Flansburgh Associates, Inc.

DSP Meeting Results:

Meeting Date: February 28, 2012

Chicopee, MA  – Chicopee Academy

Applications review at the January 24, 2012 DSP meeting and interviews at the February 28, 2012 DSP meeting resulted in the following ranking of applicants:

  1. Caolo & Bieniek Associates, Inc.
  2. Drummey Rosane Anderson, Inc.
  3. Lamoureux Pagano & Associates, Inc.

Berkshire Hills Regional School District – Monument Mountain Regional High School

Applications review at the February 28, 2012 DSP meeting resulted in the following unranked list of applicants: 

  • Flansburgh Associates, Inc.
  • Symmes Maini & McKee Associates, Inc.
  • Tetra Tech Architects & Engineers 

There will be interviews for the proposed Monument Mountain Regional High School project at the Tuesday, March 13, 2012 DSP meeting.

Spencer-East Brookfield Regional School District – David Prouty High School

Applications review at the February 28, 2012 DSP meeting resulted in the following unranked list of applicants:

  • ARC/Architectural Resources Cambridge, Inc.
  • Design Partnership of Cambridge, Inc.

There will be interviews for the proposed David Prouty High School project at the Tuesday, March 13, 2012 DSP meeting.


DSP Meeting Results:

Meeting Date: February 7, 2012

Whitman-Hanson Regional School District – Maquan Elementary School

Applications review at the January 10, 2012 DSP meeting and interviews at the February 7, 2012 DSP meeting resulted in the following ranking of applicants:

  1. Turowski2 Architecture, Inc.
  2. Raymond Design Associates, Inc.
  3. Fletcher Thompson Architecture Engineering, LLC

Winchester, MA – Winchester High School

Applications review at the January 10, 2012 DSP meeting and interviews at the February 7, 2012 DSP meeting resulted in the following ranking of applicants:

  1. Symmes Maini & McKee Associates, Inc.
  2. Tappé Associates, Inc.
  3. Flansburgh Associates, Inc.

There were no informational interviews at this meeting.


DSP Meeting Results:

Meeting Date: January 24, 2012

Auburn, MA – Auburn Middle School

Applications review at the December 20, 2011 DSP meeting and interviews at the January 24, 2012 DSP meeting resulted in the following ranking of applicants:

  1. Lamoureux Pagano & Associates, Inc.
  2. OMR Architects, Inc.
  3. ARC/Architectural Resources Cambridge

Chicopee, MA – Chicopee Academy

Applications review at the January 24, 2012 DSP meeting resulted in the following unranked list of applicants:

  • Caolo & Bieniek Associates, Inc.
  • Drummey Rosane Anderson, Inc.
  • Lamoureux Pagano & Associates, Inc.

There will be interviews for the proposed Chicopee Academy project at the February 28, 2012 DSP meeting.

There were no informational interviews at this meeting.

 


 

DSP Meeting Results:

Meeting Date: January 10, 2012

Newburyport, MA – R.A. Nock/E.G. Molin School

Applications review at the December 20, 2011 DSP meeting and interviews at the January 10, 2012 DSP meeting resulted in the following ranking of applicants:

  1. Miller Dyer Spears, Inc.
  2. Symmes Maini & McKee Associates, Inc.
  3. Flansburgh Associates, Inc.

Winchester, MA – Winchester High School

Applications review at the January 10, 2012 DSP meeting resulted in the following unranked list of applicants:

  • Symmes Maini & McKee Associates, Inc.
  • Tappé Associates, Inc.

There will be interviews for the proposed Winchester High School project at the Tuesday, February 7, 2012 DSP meeting.

Whitman-Hanson Regional School District – Maquan Elementary School

Application review at the January 10, 2012 DSP meeting resulted in the following unranked list of applicants:

  • Fletcher Thompson Architecture Engineering, LLC
  • Raymond Design Associates, Inc.
  • Turowski2 Architecture, Inc.

There will be interviews for the proposed Maquan Elementary School project at the Tuesday, February 7, 2012 DSP meeting.


DSP Meeting Results:

Meeting Date: December 20, 2011

Ayer – Ayer-Shirley Regional Middle/High School

Application review at the December 6, 2011 DSP meeting and interviews at the December 20, 2011 meeting resulted in the following ranking of applicants:

  1. Symmes Maini & McKee Associates, Inc.
  2. Design Partnership of Cambridge, Inc.
  3. Flansburgh Associates, Inc.

Newburyport – R.A. Nock/E.G. Molin School

Application review at the December 20, 2011 DSP meeting resulted in the following unranked list of applicants:

  • Miller Dyer Spears, Inc.
  • Symmes Maini & McKee Associates, Inc.

There will be interviews for the R.A. Nock/E.G. Molin School at the next scheduled DSP meeting on Tuesday, January 10, 2012.

Auburn – Auburn Middle School

Application review at the December 20, 2011 DSP meeting resulted in the following unranked list of applicants:

  • ARC/Architectural Resources Cambridge
  • Lamoureux Pagano & Associates, Inc.
  • OMR Architects, Inc.

There will be interviews for the Auburn Middle School at the Tuesday, January 24, 2012 DSP meeting.

There were no informational interviews at this meeting.


DSP Meeting Results:

Meeting Date: December 6, 2011

Tyngsboro  – Greater Lowell Technical High School

Application review at the December 6, 2011 DSP meeting resulted in the following ranking of applicants:

  1. Knight, Bagge & Anderson, Inc.
  2. Kaestle Boos Associates, Inc.
  3. Lamoureaux, Pagano & Associates, Inc.

There will not be interviews for this project.

Ayer-Shirley Regional School District – Ayer-Shirley Regional Middle High School

Application review at the December 6, 2011 DSP meeting resulted in the following unranked list of applicants:

  • Design Partnership of Cambridge, Inc.
  • Flansburgh Associates, Inc.
  • Symmes Maini & McKee Associates, Inc.

There will be interviews for the Ayer-Shirley Regional Middle High School at the next scheduled DSP meeting on December 20, 2011.


DSP Meeting Results:

Meeting Date: November 22, 2011

South Hadley – Plains Elementary School

Application review at the November 8, 2011 meeting and interviews at the November 22, 2011 meeting resulted in the following ranking of applicants:

  1. Margo Jones Architects, Inc.
  2. Flansburgh Associates, Inc.
  3. Design Partnership of Cambridge, Inc.

There were no informational interviews at this meeting.


DSP Meeting Results:

Meeting Date: November 8, 2011

South Hadley – Plains Elementary School

Application review at the November 8, 2011 DSP meeting resulted in the following unranked list of applicants:

  • Design Partnership of Cambridge, Inc.
  • Flansburgh Associates, Inc.
  • Margo Jones Architects, Inc.

Interviews for the Plains Elementary School will be held at the next DSP meeting on Tuesday, November 22, 2011.

There were informational interviews with the following firms at this meeting:

  • Fitzmeyer & Tocci Associates, Inc.
  • New Vista Designs
  • id3A, LLC

DSP Meeting Results:

Meeting Date: October 4, 2011

Greater New Bedford Regional Vocational Technical High School

Application review at the September 20, 2011 DSP meeting and interviews at the October 4, 2011 DSP meeting resulted in the following ranking of applicants:

  1. Drummey Rosane Anderson, Inc.
  2. Kaestle Boos Associates, Inc.
  3. Miller Dyer Spears, Inc.

Boston – Quincy Upper School

Application review at the October 4, 2011 DSP meeting resulted in the following ranking of applicants:

  1. HMFH Architects, Inc.
  2. Finegold Alexander and Associates, Inc.
  3. Fletcher Thompson Architecture Engineering, LLC

There were no informational interviews at this meeting.


DSP Meeting Results:

Meeting Date: September 20, 2011

Greater New Bedford Regional Vocational Technical High School

Application review at the September 20, 2011 DSP meeting resulted in the following unranked list of applicants:

  • Drummey Rosane Anderson, Inc.
  • Kaestle Boos Associates, Inc.

There were informational interviews with the following firms at this meeting:

  • ARC/Architectural Resources Cambridge

Interviews for the Greater New Bedford Regional Vocational Technical High School will be held at the next DSP meeting on Tuesday, October 4, 2011.


DSP Meeting Results:

Meeting Date: September 13, 2011

Lexington – Joseph Estabrook Elementary School

Application review at the August 23, 2011 DSP meeting and interviews at the September 13, 2011 DSP meeting resulted in the following ranking of applicants:

  1. DiNisco Design Partnership, Limited
  2. Symmes Maini & McKee Associates, Inc.
  3. Mount Vernon Group Architects, Inc.

There were informational interviews with the following firms at this meeting:

  • Cambridge Seven Associates, Inc.
  • SAR Engineering, Inc.

DSP Meeting Results:

Meeting Date: August 23, 2011

West Bridgewater – Middle-Senior High School

Application review at the August 2, 2011 DSP meeting and the interviews at the August 23, 2011 DSP meeting resulted in the following ranking of applicants:

  1. Flansburgh Associates, Inc.
  2. Design Partnership of Cambridge, Inc.
  3. Finegold Alexander and Associates, Inc.
  4. HMFH Architects, Inc.

Lexington – Joseph Estabrook Elementary School

Application review at the August 23, 2011 DSP meeting resulted in the following unranked list of applicants:

  • DiNisco Design Partnership, Limited
  • Symmes Maini & McKee Associates, Inc.

Interviews for the Lexington Joseph Estabrook Elementary School will be held at the next DSP meeting on Tuesday, September 13, 2011.

Webster – Park Avenue Elementary School

Application review at the August 23, 2011 DSP meeting resulted in the following ranking of applicants:

  1. Dore & Whittier Architects, Inc.
  2. Taylor & Burns, Inc.
  3. Kaestle Boos Associates, Inc.

There were no informational interviews at this meeting.


DSP Meeting Results:

Meeting Date: August 2, 2011

West Bridgewater – Middle-Senior High School

Application review at the August 2, 2011 DSP meeting resulted in the following unranked list of applicants:

  • Design Partnership of Cambridge, Inc.
  • Finegold Alexander and Associates, Inc.
  • Flansburgh Associates, Inc.
  • HMFH Architects, Inc.

The interviews for the West Bridgewater Middle-Senior High School project will be held at the next DSP meeting on Tuesday, August 23, 2011.

There were also informational interviews with the following firms:

  • BVH Integrated Services
  • Taylor & Burns, Inc.
  • The Arch Professional Group, Inc.

DSP Meeting Results:

Meeting Date: July 19, 2011

Wakefield – Galvin Middle School

Application review at the July 19, 2011 DSP meeting resulted in the following ranking of applicants:

  1. Tappé Associates, Inc.
  2. Drummey Rosane Anderson, Inc.
  3. Mount Vernon Group Architects, Inc.

Georgetown – Penn Brook School

Application review at the July 19, 2011 DSP meeting resulted in the following ranking of applicants:

  1. Drummey Rosane Anderson, Inc.
  2. Flansburgh Associates, Inc.
  3. Dore & Whittier Architects, Inc.

There were also informational interviews with the following firms:

  • Schwartz/Silver Architects, Inc.
  • The S/L/A/M Collaborative, Inc.

DSP Meeting Results:

Meeting Date: April 19, 2011

North Reading – North Reading Middle/High School

Application review at the April 19, 2011 DSP meeting resulted in the following ranking of applicants:

  1. Dore & Whittier Architects, Inc.
  2. Flansburgh Associates, Inc.
  3. Tappé Associates, Inc.  

There were also informational interviews with the following firms:

  • Perry Dean Rogers & Partners Architects, Inc.
  • Lindgren & Sharples, P.C.

Meeting Date: March 15, 2011

Peabody – Higgins Middle School

Application review at the February 15, 2011 DSP meeting and finalist interviews at the March 15, 2011 DSP meeting resulted in the following ranking of applicants:

1.    DiNisco Design Partnership, Limited
2.    Mount Vernon Group Architects, Inc.
3.    Kaestle Boos Associates, Inc.

Greenfield – Greenfield High School

Applications review at the March 15, 2011 DSP meeting resulted in the following ranking of applicants:

1.    Dore & Whittier Architects, Inc.
2.    Symmes Maini & McKee Associates, Inc.
3.    The S/L/A/M Collaborative

There were no informational interviews at this meeting.

 


 

Meeting Date: March 1, 2011

Stoneham – Stoneham Middle School 

Application review at the February 15, 2011 DSP meeting and interviews at the March 1, 2011 DSP meeting resulted in the following ranking of applicants:

  1. Tappé Associates, Inc.
  2. Drummey Rosane Anderson, Inc.
  3. Mount Vernon Group Architects, Inc. and Raymond Design Associates, Inc. (tied)

Williamsburg – Ann T. Dunphy School

Application review at the March 1, 2011 DSP meeting resulted in the following ranking of applicants:

  1. Drummey Rosane Anderson, Inc.
  2. JCJ Architecture, PC
  3. Fletcher Thompson Architecture Engineering, LLC

There were no informational interviews at this meeting. 

 


 

Meeting Date: February 15, 2011

Concord-Carlisle - Concord-Carlisle High School

Application review at the February 15, 2011 DSP meeting resulted in the following ranking of applicants:

  1. OMR Architects, Inc.
  2. Lavallee Brensinger Architects
  3. ARCADD, Inc.

Wilmington – Wilmington High School

Application review at the February 15, 2011 DSP meeting resulted in the following ranking of applicants:

  1. Dore & Whittier Architects, Inc.
  2. Symmes Maini & McKee Associates, Inc.
  3. Flansburgh Associates, Inc.

Peabody – J. Henry Higgins Middle School

Application review at the February 15, 2011 DSP meeting resulted in the following unranked list:

  • DiNisco Design Partnership, Limited
  • Kaestle Boos Associates, Inc.
  • Mount Vernon Group Architects, Inc.

Interviews for the Peabody Higgins Middle School project have not yet been scheduled.

Stoneham – Stoneham Middle School

Application review at the February 15, 2011 DSP meeting resulted in the following unranked list:

  • Drummey Rosane Anderson, Inc.
  • Tappé Associates, Inc.

Interviews for the Stoneham Middle School project have not yet been scheduled.

There were no informational interviews at this meeting.

 


 

Meeting Date: January 11, 2011

Lincoln - Lincoln School

Application review at the December 7, 2010 DSP meeting and interviews at the January 11, 2011 DSP meeting resulted in the following ranking of applicants:

  1. OMR Architects, Inc.
  2. Symmes Maini McKee Associates, Inc.

Saugus - Belmonte Middle School

Application review and interviews at the January 11, 2011 DSP meeting resulted in the following ranking of applicants:

  1. Fletcher Thompson Architecture Engineering, LLC
  2. Mount Vernon Group Architects, Inc.

There were no informational interviews at this meeting.

 

 

 

DSP Meeting Results:

Meeting Date: July 19, 2011


Meeting Date: December 21, 2010

Norton – Norton High School

Application review at the December 7, 2010 DSP meeting and interviews at the December 21, 2010 DSP meeting resulted in the following ranking of applicants:

 

  1. JCJ Architecture, PC
  2. Kaestle Boos Associates, Inc.

There were no informational interviews at this meeting. 


Meeting Date: December 7, 2010

Lincoln – Lincoln School

Application review at the December 7, 2010 DSP meeting resulted in the following unranked list:

  • OMR Architects, Inc.
  • Symmes Maini & McKee Associates, Inc.

Interviews for this project will take place on Tuesday, January 11, 2011.

Norton – Norton High School

Application review at the December 7, 2010 DSP meeting resulted in the following unranked list:

  • JCJ Architecture, PC
  • Kaestle Boos Associates, Inc.

Interviews for this project will take place on Tuesday, December 21, 2010.

There were informational interviews with the following firms at this meeting:

  • Eck MacNeely Architects Inc.
  • Mount Vernon Group Architects, Inc.

 

Meeting Date: November 16, 2010

Springfield - Forest Park Middle School

Application review at the October 19, 2010 DSP meeting and interviews at the November 16, 2010 DSP meeting resulted in the following ranking of applicants:

  1. Perkins Eastman
  2. Drummey Rosane Anderson, Inc.
  3. Symmes Maini & McKee Associates, Inc.

There were informational interviews with the following firms at this meeting:

  • Cannon Boston, Inc. and affiliates d/b/a Cannon Design
  • HMFH Architects, Inc.

The next DSP meeting will be held on December 7, 2010.


 

 

Meeting Date: November 2, 2010

 
Weston – Field Elementary School
 
Application review at the October 5, 2010 DSP meeting and interviews at the November 2, 2010 meeting resulted in the following ranking of applicants:
1.      Jonathan Levi Architects, LLC
2.      Flansburgh Associates, Inc.
3.      Dore & Whittier Architects, Inc.
 
Brookline - Heath Elementary School
 
Application review at the October 19, 2010 DSP meeting and interviews at the November 2, 2010 meeting resulted in the following ranking of applicants:
1.      Miller Dyer Spears, Inc.
2.      Maryann Thompson Architects
3.      Arrowstreet, Inc.
 
There were no informational interviews at this meeting.
 

 

Meeting Date: October 19, 2010

 
Brookline – Heath School
 
Application review at the October 19, 2010 DSP meeting resulted in the following unranked list:
  • Kaestle Boos Associates, Inc.
  • Maryann Thompson Architects
  • Miller Dyer Spears, Inc.
  • Arrowstreet, Inc.
Interviews of these applicants for the Heath School project will be conducted at the DSP meeting on Tuesday, November 2, 2010.
 
Springfield – Forest Park Middle School
 
Application review at the October 19, 2010 DSP meeting resulted in the following unranked list:
  • Perkins Eastman
  • Drummey Rosane Anderson, Inc.
Interviews of these applicants for the Forest Park Middle School project will be conducted at the DSP meeting on Tuesday, November 16, 2010.
 
Hathorne – Essex North Shore Agricultural and Technical School
 
Application review at the October 19, 2010 meeting resulted in the following ranking of applicants:
1.      Design Partnership of Cambridge, Inc.
2.      Fletcher Thompson Architecture Engineering, LLC
3.      Mount Vernon Group Architects, Inc.
 
There will not be interviews for this project.
 
There were no informational interviews at this meeting.
 

 

Meeting Date: October 5, 2010

 
Southern Worcester County Regional Vocational District - Bay Path Regional Vocational Technical High School
 
Application review at the September 21, 2010 DSP meeting and interviews at the October 5, 2010 DSP meeting resulted in the following ranking of applicants:
1.      Kaestle Boos Associates, Inc.
2.      Fletcher Thompson Architecture Engineering, LLC
3.      HMFH Architects, Inc.
 
Weston – Field School
 
Application review at the October 5, 2010 DSP meeting resulted in the following unranked list:
  • Dore & Whittier Architects, Inc.
  • Flansburgh Associates, Inc.
  • Jonathan Levi Architects LLC
Interviews of these applicants for the Weston Field School project will be conducted at the DSP meeting on Tuesday, November 2, 2010.
 
There were no informational interviews at this meeting.
 

 

Meeting Date: September 21, 2010

 
Southern Worcester County Regional School District – Bay Path Regional Vocational Technical High School
 
Application review at the September 21, 2010 DSP meeting resulted in the following unranked list:
  • Fletcher Thompson Architecture Engineering, LLC
  • Kaestle Boos Associates, Inc.
Interviews of these applicants will be conducted at the next DSP meeting which is scheduled for Tuesday, October 5, 2010
 
There were informational interviews with the following firms at this meeting:
  • Kao Design Group, Inc.
  • Gale Associates, Inc.
  • Tetra Tech, Inc.

 

 

 

Meeting Date: September 7, 2010

 
North Adams – Silvio O. Conte Middle School
 
Application review at the September 7, 2010 DSP meeting resulted in the following ranking of applicants:
1.      Margo Jones Architects, Inc.
2.      JCJ Architecture, PC
3.      Fletcher Thompson Architecture Engineering, LLC
 
There will not be interviews for this project.
 
There were informational interviews with the following firms at this meeting:
  • Miller Dyer Spears, Inc.
  • Habeeb & Associates Architects, Inc.
  • Dietz & Company Architects, Inc.

  

Meeting Date: July 27, 2010

 
Franklin – Franklin High School
 
Application review at the July 13, 2010 DSP and interviews at the July 27, 2010 meeting resulted in the following ranking of applicants:
1.      CGKV Architects, Inc.
2.      Design Partnership of Cambridge, Inc.
3.      Kaestle Boos Associates, Inc.
4.      Flansburgh Associates, Inc.
 
Marlborough – Assabet Valley Regional Technical High School
 
Application review at the July 27, 2010 DSP meeting resulted in the following ranked list:
1.      Design Partnership of Cambridge, Inc.
2.      The S/L/A/M Collaborative
3.      Mount Vernon Group Architects, Inc.
 
There were no informational interviews at this meeting.
 

 

Meeting Date: July 13, 2010

 
South Easton - Southeastern Regional Vocational Technical High School
 
Application review at the July 13, 2010 DSP meeting resulted in the following ranked list:
1.      Drummey Rosane Anderson, Inc.
2.      Fletcher Thompson Architecture Engineering, LLC
3.      Mount Vernon Group Architects, Inc.
 
There will not be interviews for this project.
 
Franklin – Franklin High School
 
Application review at the July 13, 2010 DSP meeting resulted in the following unranked list:
  • CGKV Architects, Inc.
  • Design Partnership of Cambridge, Inc.
  • Flansburgh Associates, Inc.
  • Kaestle Boos Associates, Inc.
Interviews of these applicants will be conducted at the next DSP meeting which is scheduled for Tuesday, July 27, 2010.
 
Informational Interviews
 
There were informational interviews with the following firms at this meeting:
  • Bechtel Frank Erickson Architects, Inc.
  • The Robinson Green Beretta Corporation
  • Hesnor Engineering Company

 

 

Meeting Date: June 29, 2010

 
Southwick-Tolland Regional School District - Woodland Elementary School
 
Application reviews at the June 15, 2010 DSP meeting and interviews at the June 29, 2010 meeting resulted in the following ranking of applicants:
  • JCJ Architecture + Interiors, PC
  • CGKV Architects, Inc.
  • Margo Jones Architects, Inc.
Green Repair Program
 
Application reviews resulted in pre-qualification by category of the following list of applicants for participation in the Green Repair Program:
 
Boilers/Windows/Roofs:
  • Baker/Wohl Architects, Inc.
  • Bradley Architects, Inc.
  • Cannon Boston, Inc. dba Cannon Design
  • CGKV Architects, Inc.
  • CSS Architects Incorporated
  • DiMarinisi & Wolfe Architects Urban Design
  • Durland Van Voorhis Architects, Inc.
  • Habeeb & Associates Architects, Inc.
  • ICON architecture, inc.
  • Knight, Bagge & Anderson, Inc.
  • LPBA/Architects, Inc.
  • Reinhardt Associates, Inc.
  • Tighe & Bond, Inc.
  • Turowski2 Architecture, Inc.
Boilers:
  • BLW Engineers, Inc.
  • BVH Integrated Services, Inc.
  • Hesnor Engineering Company
  • Richard D. Kimball Company, Inc.
  • SED Associates Corp.
Windows/Roofs:
  • Gale Associates, Inc.
  • Russo Barr Associates, Inc.
Please note that there is no guarantee that a Designer pre-qualified by the DSP for the Green Repair Program will be selected for a project. Please also note that this pre-qualification of Designers is solely for purposes of the Green Repair Program, and this pre-qualification will have no bearing on the selection of a Designer for projects that are not part of the Green Repair Program.
 
There were no informational interviews.
 

 

Meeting Date: June 15, 2010

 
Norfolk County – Norfolk County Agricultural High School
 
Application review at the June 15, 2010 DSP meeting resulted in the following ranking of applicants:
  • Turowski2 Architecture, Inc.
  • Drummey Rosane Anderson, Inc.
  • Kaestle Boos Associates, Inc. 
There will not be interviews for this project.
 
Southwick-Tolland Regional School District – Woodland Elementary School
 
Application review at the June 15, 2010 DSP meeting resulted in the following unranked list:
  • CGKV Architects, Inc.
  • JCJ Architecture + Interiors, PC
  • Margo Jones Architects, Inc. 
The interview date for the Woodland Elementary School project has not yet been determined.
 
There were informational interviews with the following firms at this meeting:
  • XChange Architects
  • Studio G Architects
  • The Gluck Architectural Collaborative, PC dba Peter Gluck and Partners

 

Meeting Date: Tuesday, May 18, 2010

 
Douglas – Douglas Intermediate School
 
Application reviews at the May 4, 2010 DSP meeting and interviews at the May 18, 2010 meeting resulted in the following ranking of applicants:
  • DiNisco Design Partnership, Ltd.
  • Kaestle Boos Associates, Inc.
  • Taylor & Burns, Inc.
There were no informational interviews.
 

 

Meeting Date: Tuesday, May 4, 2010

 
Quincy – New Central Middle School
 
Application review at the April 6, 2010 DSP meeting and interviews at the May 4, 2010 DSP meeting resulted in the following ranking of applicants:
  • Ai3 Architects, LLC
  • CGKV Architects, Inc.
  • Kaestle Boos Associates, Inc.
Douglas – Douglas Intermediate School
 
Application review at the May 4, 2010 DSP meeting resulted in the following unranked list:
  • DiNisco Design Partnership, Limited
  • Kaestle Boos Associates, Inc.
  • Lamoureux Pagano Associates, Inc.
  • Taylor & Burns, Inc. 
Interviews of these applicants will be conducted at the next meeting scheduled for May 18, 2010.
 
Medway – Medway Middle School
 
Application reviews at the May 4, 2010 DSP resulted in the following ranking of applicants:
  • Knight, Bagge & Anderson, Inc.
  • Mount Vernon Group Architects, Inc.
  • TLCR Associates, Inc.
There were no informational interviews.
 

 

Meeting Date: Tuesday, April 6, 2010

 
Quincy – New Central Middle School
 
Application review at the April 6, 2010 DSP meeting resulted in the following unranked list:
  • Ai3 Architects, LLC
  • Kaestle Boos Associates, Inc.
  • CGKV Architects, Inc.
Interviews of these applicants will be conducted at the next meeting scheduled for Tuesday, May 4, 2010.
 
There were three informational interviews at this meeting:
  • Durkee, Brown, Viveiros & Werenfels Architects
  • The Architectural Team, Inc.
  • Fletcher Thompson Architecture Engineering, LLC.

 

Meeting Date: Tuesday, March 16, 2010

 
Fairhaven – Rogers Elementary School
 
Application reviews at the February 16, 2010 DSP meeting and interviews at the March 16, 2010 meeting resulted in the following ranking of applicants:
  • HMFH Architects, Inc.
  • DiNisco Design Partnership, Limited
  • Dore and Whittier Architects, Inc.

There were no informational interviews.


 

 

Meeting Date: Tuesday, February 16, 2010

 
Winchester – Vinson Owen Elementary School
 
Application review at the February 16, 2010 DSP meeting resulted in the following ranking of applicants:
1.      Tappé Associates, Inc.
2.      Flansburgh Associates, Inc.
3.      DiNisco Design Partnership, Limited
 
Fairhaven – Rogers Elementary School
 
Application review at the February 16, 2010 DSP meeting resulted in the following unranked list of applicants:
  • DiNisco Design Partnership, Limited
  • Dore & Whittier Architects, Inc.
  • HMFH Architects, Inc.
  • Turowski2 Architecture, Inc.
Interviews of these applicants will be conducted at the next meeting scheduled for Tuesday, March 16, 2010.
 
There were two informational interviews at this meeting:
  • Perkins Eastman
  • Maguire Group Inc.

 

 

Meeting Date: Tuesday, February 2, 2010

 
Dracut– Dracut Senior High School
 
Application review at the January 12, 2010 DSP meeting and interviews at the February 2, 2010 meeting resulted in the following ranking of applicants:
1.      Mount Vernon Group Architects, Inc.
2.      Finegold Alexander and Associates, Inc.
3.      Flansburgh Associates, Inc.
 
Hudson – John F. Kennedy Middle School
 
Application review at the January 12, 2010 DSP meeting and interviews at the February 2, 2010 meeting resulted in the following ranking of applicants:
1.      The Office of Michael Rosenfeld, Inc.
2.      Kaestle Boos Associates, Inc.
3.      DiNisco Design Partnership Limited and HMFH Architects, Inc. (tied)
 
There were no informational interviews at this meeting.
 

 

Meeting Date: Tuesday, January 12, 2010

 
Dracut - Dracut Senior High School
 
Application review at the January 12, 2010 DSP meeting resulted in the following unranked list:
  • Finegold Alexander and Associates, Inc.
  • Flansburgh Associates, Inc.
  • Mount Vernon Group Architects, Inc.
Interviews of these applicants will be conducted at the next meeting scheduled for Tuesday, February 2, 2010.
 
Hudson – John F. Kennedy Middle School
 
Application review at the January 12, 2010 DSP meeting resulted in the following unranked list:
  • The Office of Michael Rosenfeld, Inc.
  • Kaestle Boos Associates, Inc.
Interviews of these applicants will be conducted at the next meeting scheduled for Tuesday, February 2, 2010.
 
Narragansett RSD – Templeton Center Elementary School
 
Application review at the January 12, 2010 DSP meeting resulted in the following ranking of applicants:
1.      Symmes Maini & McKee Associates
2.      Lamoureux Pagano Associates, Inc.
3.      Mount Vernon Group Architects, Inc.
 
There will not be interviews for this project.
 
There were no informational interviews at this DSP meeting.