Below are the results of the 2010-2014 MSBA's Designer Selection Panel meetings. The results are displayed in descending order, starting with the results of the most recent DSP meeting.
DSP Meeting Results:
Meeting Date: December 23, 2014
Billerica Memorial High School, Billerica, MA
Applications review at the Tuesday, December 23, 2014 DSP meeting resulted in the following unranked list of applicants:
- Dore & Whittier Architects, Inc.
- Perkins + Will
- Symmes Maini & McKee Associates, Inc.
Interviews for the proposed Billerica Memorial High School project will be held on Tuesday, January 13, 2015.
A presentation for an informational interview at this meeting was from the following firm:
- TBA Architects, Inc.
Meeting Date: December 9, 2014
Carver Elementary School, Carver, MA
Applications review at the Tuesday, November 18, 2014 DSP meeting and finalist interviews at the Tuesday, December 9, 2014 meeting resulted in the following ranking of applicants:
- HMFH Architects, Inc.
- Perkins + Will
- Flansburgh Associates, Inc.
The next meeting of the Panel will be held on Tuesday, December 23, 2014.
Meeting Date: November 18, 2014
Carver Elementary School, Carver, MA
Applications review at the Tuesday, November 18, 2014 DSP meeting resulted in the following unranked list of applicants:
- Design Partnership of Cambridge, Inc.
- Flansburgh Associates, Inc.
- HMFH Architects, Inc.
- Perkins + Will
Interviews for the proposed Carver Elementary School project will be held on Tuesday, December 9, 2014.
Meeting Date: October 21, 2014
Center Elementary School, Hopkinton, MA
Applications review at the Tuesday, October 7, 2014 DSP meeting and finalist interviews at the Tuesday, October 21, 2014 resulted in the following ranking of applicants:
- Drummey Rosane Anderson, Inc.
- OMR Architects, Inc.
- JCJ Architecture, PC
Meeting Date: October 7, 2014
Center Elementary School, Hopkinton, MA
Applications review at the Tuesday, October 7, 2014 DSP meeting resulted in the following unranked list of applicants:
- Drummey Rosane Anderson, Inc.
- JCJ Architecture, PC
- OMR Architects, Inc.
Interviews for the proposed Center Elementary School project will be held on Tuesday, October 21, 2014.
West Street Elementary School, Granby, MA
Applications review at the Tuesday, October 7, 2014 DSP meeting resulted in the following ranking of applicants:
- Jones Whitsett Architects, Inc.
- OMR Architects, Inc.
- Dore & Whittier Architects, Inc.
Meeting Date: September 23, 2014
Cabot Elementary School, Newton, MA
Applications review at the September 9, 2014 DSP meeting and finalist interviews at the September 23, 2014 DSP meeting resulted in the following ranking of applicants:
- DiNisco Design Partnership Limited
- Design Partnership of Cambridge, Inc.
- Tappè Associates, Inc.
The next meeting of the Designer Selection Panel will be on Tuesday, October 7, 2014.
Meeting Date: September 9, 2014
Early Childhood Education Center, Dedham, MA
Applications review at the Tuesday, August 12, 2014 DSP meeting and interviews at the September 9, 2014 DSP meeting resulted in the following ranking of applicants:
- Knight, Bagge & Anderson, Inc.
- DiNisco Design Partnership, Limited
- Studio G Architects, Inc.
Cabot Elementary School, Newton, MA
Applications review at the September 9, 2014 DSP meeting resulted in the following unranked list of applicants:
- Design Partnership of Cambridge, Inc.
- DiNisco Design Partnership Limited
- Tappè Associates, Inc.
Interviews for the Cabot Elementary School, Newton, MA will be held at the next Designer Selection Panel meeting on Tuesday, September 23, 2014.
Meeting Date: August 26, 2014
John Hannigan Elementary School, New Bedford, MA
Applications review at the Tuesday, August 12, 2014 DSP meeting and finalist interviews at the Tuesday, August 26, 2014 DSP meeting resulted in the following ranking of applicants:
- Turowski2 Architecture, Inc.
- Mount Vernon Group Architects, Inc.
- Raymond Design Associates, Inc.
Briscoe Middle School, Beverly, MA
Applications review at the Tuesday, August 12, 2014 DSP meeting and finalist interviews at the Tuesday, August 26, 2014 DSP meeting resulted in the following ranking of applicants:
- Ai3 Architects LLC
- Symmes Maini & McKee Associates, Inc.
- Design Partnership of Cambridge, Inc.
The next meeting of the Panel will be held on Tuesday, September 9, 2014.
Meeting Date: August 12, 2014
Briscoe Middle School, Beverly, MA
Applications review at the Tuesday, August 12, 2014 DSP meeting resulted in the following unranked list of applicants:
- Ai3 Architects, LLC
- Design Partnership of Cambridge, Inc.
- Symmes Maini & McKee Associates, Inc.
Interviews for the proposed Briscoe Middle School project will be held on Tuesday, August 26, 2014.
John Hannigan Elementary School, New Bedford, MA
Applications review at the Tuesday, August 12, 2014 DSP meeting resulted in the following unranked list of applicants:
- Mount Vernon Group Architects, Inc.
- Raymond Design Associates, Inc.
- Turowski2 Architecture, Inc.
Interviews for the proposed John Hannigan Elementary School project will be held on Tuesday, August 26, 2014.
Early Childhood Education Center, Dedham, MA
Applications review at the Tuesday, August 12, 2014 DSP meeting resulted in the following unranked list of applicants:
- DiNisco Design Partnership, Limited
- Knight, Bagge & Anderson, Inc.
- Studio G. Architects, Inc.
Interviews for the proposed Early Childhood Education Center project will be held on Tuesday, September 9, 2014.
Meeting Date: April 22, 2014
There were no application reviews.
Presentations for informational interviews at this meeting were from the following firms:
- DHK Architects, Inc.
- Reinhardt Associates, Inc.
- LLB Architects
- Dietz & Company
- Perkins Eastman
The Tuesday, May 6, 2014 DSP meeting has been cancelled.
Meeting Date: February 25, 2014
Wyman – Hurld Elementary School, Woburn, MA
Applications review at the Tuesday, February 11, 2014 DSP meeting and finalist interviews at the Tuesday, February 25, 2014 DSP meeting resulted in the following ranking of applicants:
- DiNisco Design Partnership, Ltd.
- Knight Bagge & Anderson, Inc.
- Perkins + Will
The Tuesday, March 11, 2014 DSP meeting has been cancelled.
Meeting Date: February 11, 2014
Wyman – Hurld Elementary School, Woburn, MA
Applications review at the Tuesday, February 11, 2014 DSP meeting resulted in the following unranked list of applicants:
- DiNisco Design Partnership, Ltd.
- Knight Bagge & Anderson, Inc.
- OMR Architects, Inc.
- Perkins + Will
Interviews for the proposed Wyman-Hurld project will be held on Tuesday, February 25, 2014 at 8:30 AM.
Meeting Date: January 14, 2014
Taconic High School, Pittsfield, MA
Applications review at the Tuesday, December 17, 2013 DSP meeting and finalist interviews at the Tuesday, January 14, 2014 DSP meeting resulted in the following ranking of applicants:
- Drummey Rosane Anderson, Inc.
- Kaestle Boos Associates, Inc.
- Dore & Whittier Architects, Inc.
The Tuesday, January 28, 2014 Designer Selection Panel meeting has been cancelled. The next meeting of the Panel will be held on Tuesday, February 11, 2014.
DSP Meeting Results:
Meeting Date: December 17, 2013
Taconic High School, Pittsfield, MA
Applications review at the Tuesday, December 17, 2013 DSP meeting resulted in the following unranked list of applicants:
- Dore & Whittier Architects, Inc.
- Drummey Rosane Anderson, Inc.
- Kaestle Boos Associates, Inc.
Interviews for the Taconic High School, Pittsfield, MA will be held at the next scheduled Designer Selection Panel meeting on Tuesday, January 14, 2014.
DSP Meeting Results:
Meeting Date: November 19, 2013
Gates Intermediate School, Scituate, MA
Applications review at the November 5, 2013 DSP meeting and finalist interviews at the November 19, 2013 DSP meeting resulted in the following ranking of applicants:
- Dore & Whittier Architects, Inc.
- Design Partnership of Cambridge, Inc.
- Drummey Rosane Anderson, Inc.
Please note that the Tuesday, December 3, 2013 DSP Meeting has been canceled.
The next meeting of the DSP is scheduled for Tuesday, December 17, 2013.
DSP Meeting Results:
Meeting Date: November 5, 2013
Nelson Place School, Worcester, MA
Applications review at the Tuesday, October 22, 2013 DSP meeting and finalist interviews at the Tuesday, November 5, 2013 DSP meeting resulted in the following ranking of applicants:
- Lamoureux Pagano & Associates, Inc.
- Perkins Eastman
- Flansburgh Associates, Inc.
Gates Intermediate School, Scituate, MA
Applications review at the November 5, 2013 DSP meeting resulted in the following unranked list of applicants:
- Design Partnership of Cambridge, Inc.
- Dore & Whittier Architects, Inc.
- Drummey Rosane Anderson, Inc.
- Miller Dyer Spears, Inc.
Interviews for the Gates Intermediate School, Scituate, MA will be held at the next scheduled Designer Selection Panel meeting on Tuesday, November 19, 2013.
DSP Meeting Results:
Meeting Date: October 22, 2013
Nelson Place School, Worcester, MA
Applications review at the Tuesday, October 22, 2013 DSP meeting resulted in the following unranked list of applicants:
- Flansburgh Associates, Inc.
- Lamoureux Pagano & Associates, Inc.
- OMR Architects, Inc.
- Perkins Eastman
Interviews for the Nelson Place School will be held at the next scheduled DSP meeting on November 5, 2013.
There were informational interviews with the following firms:
- Kennedy & Violich Architecture, Ltd.
- Diversified Technology Consultants, Inc.
The next meeting of the DSP will be held on Tuesday, November 5, 2013.
DSP Meeting Results:
Meeting Date: August 20, 2013
Sarah W. Gibbons Middle School, Westborough, MA
Applications review at the Tuesday, July 9, 2013 DSP meeting and finalist interviews at the Tuesday, August 20, 2013 meeting resulted in the following ranking of applicants:
- Habeeb & Associates Architects, Inc.
- Turowski2 Architecture, Inc.
- Tetra Tech Architects & Engineers
The next meeting of the DSP scheduled for Tuesday, September 10, 2013 has been canceled.
DSP Meeting Results:
Meeting Date: July 23, 2013
Accelerated Repair Designer Applications Review
Applications review resulted in the following recommendation of applicants for the Accelerated Repair Program:
Roof, Windows, and Boilers
Baker/Wohl Architects
CGKV Architects, Inc.
CSS Architects, Inc.
Dietz & Co. Architects, Inc.
Habeeb & Associates Architects
Icon Architecture, Inc.
S/L/A/M Collaborative
Taylor & Burns
Tighe & Bond
Roof and Window Only
CBI Consulting, Inc.
Civitects
Gale Associates, Inc.
Raymond Design Associates, Inc.
Russo Barr Associates, Inc.
Boiler Only
Consulting Engineering Services LLC
Hesnor Engineering
RDK Engineers
Shekar & Associates
The MSBA will assign a Designer from one of the above three groups to each Accelerated Repair project. There is no guarantee that a Designer in any of the above three groups will be assigned to any particular number of Accelerated Repair projects or to any Accelerated Repair project at all. The MSBA may assign more than one Accelerated Repair project to a Designer. The grouping and selection of Designers described above is solely for the purposes of the Accelerated Repair Program.
Plymouth South High School, Plymouth, MA
Applications review at the July 23, 2013 DSP meeting resulted in the following ranking of applicants:
- Ai3 Architects LLC
- Drummey Rosane Anderson, Inc.
- Mount Vernon Group Architects, Inc.
The Tuesday, August 6, 2013 Designer Selection Panel meeting has been cancelled.
The next scheduled meeting of the Panel will held on Tuesday, August 20, 2013.
DSP Meeting Results:
Meeting Date: July 9, 2013
Edward Devotion School, Brookline, MA
Applications review at the June 25, 2013 DSP meeting and finalist interviews at the July 9, 2013 meeting resulted in the following ranking of applicants:
- HMFH Architects, Inc.
- Flansburgh Associates, Inc.
Sarah W. Gibbons Middle School, Westborough, MA
After the DSP voted to accept the withdrawal of the application submitted by Fletcher Thompson Architecture Engineering, LLC, the panel unanimously voted to interview the three remaining applicants for the proposed project. Interviews will be with the following applicants:
- Habeeb & Associates Architects, Inc.
- Tetra Tech Architects & Engineers
- Turowski2 Architecture, Inc.
Interviews for the Sarah W. Gibbons Middle School will be held on Tuesday, August 20, 2013.
MSBA Staff Presentation on Construction Cost Data and Change Order Data
MSBA staff gave a presentation which provided an overview of cost data and change order data. The presentation is summarized as follows:
The Director of Project Management reviewed the cost data analysis that the MSBA has performed. This analysis demonstrates that construction costs have remained relatively stable and that current MSBA funding levels continue to be appropriate. The MSBA plans to monitor cost data annually.
An MSBA Senior Project Manager from the Construction Administration Team provided an update on a change order data analysis that was undertaken by staff, including a review of the data, methodology of analysis, and preliminary findings. For additional information view the presentation.
The next meeting of the DSP will be held on Tuesday, July 23, 2013.
Meeting Date: June 25, 2013
Hadley Elementary School, Swampscott, MA
Applications review at the June 25, 2013 DSP meeting resulted in the following ranking of applicants:
- Mount Vernon Group Architects, Inc.
- Symmes Maini & McKee Associates, Inc.
Edward Devotion School, Brookline, MA
Applications review at the June 25, 2013 DSP meeting resulted in the following unranked list of applicants:
- Flansburgh Associates, Inc.
- HMFH Architects, Inc.
Interviews for the Edward Devotion School (Brookline, MA) will be held on Tuesday, July 9, 2013.
The next scheduled meeting of the Panel will be held on Tuesday, July 9, 2013.
DSP Meeting Results:
Meeting Date: May 7, 2013
Clark Avenue Middle School – Chelsea, MA
Applications review at the April 9, 2013 DSP meeting and interviews at the May 7, 2013 DSP meeting resulted in the following ranking of applicants:
- HMFH Architects, Inc.
- Mount Vernon Group Architects, Inc.
- Flansburgh Associates, Inc.
Caleb Dustin Hunking Middle School – Haverhill, MA
Applications review at the April 9, 2013 DSP meeting and interviews at the May 7, 2013 DSP meeting resulted in the following ranking of applicants:
- JCJ Architecture, PC
- Design Partnership of Cambridge, Inc.
- Dore & Whittier Architects, Inc.
There will not be a DSP meeting on Tuesday, May 21, 2013.
The next scheduled meeting of the Panel will be held on Tuesday, June 11, 2013.
DSP Meeting Results:
Meeting Date: April 23, 2013
Holbrook Junior-Senior High School – Holbrook, MA
Applications review at the April 9, 2013 DSP meeting and interviews at the April 23, 2013 DSP meeting resulted in the following ranking of applicants:
- Flansburgh Associates, Inc.
- Drummey Rosane Anderson, Inc.
- Kaestle Boos Associates, Inc.
Lincoln Street Elementary School – Northborough, MA
Applications review at the April 23, 2013 DSP meeting resulted in the following ranking of applicants:
- Lamoureux Pagano & Associates, Inc.
- Miller Dyer Spears, Inc.
- Kaestle Boos Associates, Inc.
The next scheduled meeting of the Panel will be held on Tuesday, May 7, 2013.
DSP Meeting Results:
Meeting Date: April 9, 2013
Holbrook Junior-Senior High School – Holbrook, MA
Applications review at the April 9, 2013 DSP meeting resulted in the following unranked list of applicants:
- Drummey Rosane Anderson, Inc.
- Flansburgh Associates, Inc.
- Kaestle Boos Associates, Inc.
Interviews for the Holbrook Junior-Senior High School project will take place at the Tuesday, April 23, 2013 DSP meeting.
Clark Avenue Middle School – Chelsea, MA
Applications review at the April 9, 2013 DSP meeting resulted in the following unranked list of applicants:
- Flansburgh Associates, Inc.
- HMFH Architects, Inc.
- Mount Vernon Group Architects, Inc.
Interviews for the Clark Avenue Middle School project will take place at the Tuesday, May 7, 2013 DSP meeting.
Caleb Dustin Hunking Middle School – Haverhill, MA
Applications review at the April 9, 2013 DSP meeting resulted in the following unranked list of applicants:
- Design Partnership of Cambridge, Inc.
- Dore & Whittier Architects, Inc.
- JCJ Architecture, PC
Interviews for the Caleb Dustin Hunking Middle School project will take place at the Tuesday, May 7, 2013 DSP meeting.
DSP Meeting Results:
Meeting Date: March 5, 2013
Minuteman Regional Vocational Technical School – Lexington, MA
Applications review at the February 19, 2013 DSP meeting and finalist interviews at the March 5, 2013 DSP resulted in the following ranking of applicants:
- Lamoureux Pagano & Associates, Inc.
- Kaestle Boos Associates, Inc.
- Drummey Rosane Anderson, Inc.
Woodland Elementary School – Milford, MA
Applications review at the March 5, 2013 DSP meeting resulted in the following ranking of applicants:
- HMFH Architects, Inc.
- Symmes Maini & McKee Associates, Inc.
- Perkins Eastman
Lincoln Street Elementary School – Northborough, MA
Review of the Request for Designer Services resulted in the District’s decision to revise and re-advertise the RFS.
There were no informational interviews at this meeting.
DSP Meeting Results:
Meeting Date: February 19, 2013
North Middlesex Regional High School – Townsend, MA
Applications review at the January 22, 2013 DSP meeting and finalist interviews at the February 19, 2013 DSP meeting resulted in the following ranking:
- Symmes Maini & McKee Associates, Inc.
- Design Partnership of Cambridge, Inc.
- Flansburgh Associates, Inc.
Minuteman Regional Vocational Technical School – Lexington, MA
Applications review at the February 19, 2013 DSP meeting resulted in the following unranked list of applicants:
- Drummey Rosane Anderson, Inc.
- Kaestle Boos Associates, Inc.
- Lamoureux Pagano & Associates, Inc.
There were no informational interviews at this meeting.
Interviews for the Minuteman Regional Vocational High School project are scheduled for the next DSP meeting on Tuesday, March 5, 2013.
DSP Meeting Results:
Meeting Date: February 5, 2013
Lunenburg High School – Lunenburg, MA
Applications review at the January 8, 2013 DSP meeting and finalist interviews at the February 5, 2013 DSP meeting resulted in the following ranking:
- Tappé Associates, Inc.
- Symmes Maini & McKee Associates, Inc.
- Ai3 Architects LLC
West Parish Elementary School – Gloucester, MA
Applications review at the February 5, 2013 DSP meeting resulted in the following ranking of applicants:
- Dore & Whittier Architects, Inc.
- Flansburgh Associates, Inc.
- Perkins Eastman
There were no informational interviews at this meeting.
DSP Meeting Results:
Meeting Date: January 22, 2013
Abington, MA – Frolio Middle School
Applications review at the January 8, 2013 DSP meeting and finalist interviews at the January 22, 2013 DSP meeting resulted in the following ranking of applicants:
- Ai3 Architects LLC
- Design Partnership of Cambridge, Inc.
- Flansburgh Associates, Inc.
North Middlesex Regional High School, Townsend, MA
Applications review at the January 22, 2013 DSP meeting resulted in the following unranked list of applicants:
- Design Partnership of Cambridge, Inc.
- Flansburgh Associates, Inc.
- Symmes Maini& McKee Associates, Inc.
There will be interviews for the North Middlesex Regional High School, Townsend, MA at the Tuesday, February 19, 2013 DSP meeting.
There were no informational interviews at this meeting.
DSP Meeting Results:
Meeting Date: January 8, 2013
Boston, MA – Dearborn School
Applications review at the December 18, 2012 DSP meeting and finalist interviews at the January 8, 2013 DSP meeting resulted in the following ranking:
- Jonathan Levi Architects LLC
- Leers Weinzapfel Associates Architects, Inc.
- Symmes Maini & McKee Associates, Inc.
Abington, MA – Frolio Middle School
Applications review at the January 8, 2013 DSP meeting resulted in the following unranked list of applicants:
- Ai3 Architects LLC
- Design Partnership of Cambridge, Inc.
- Flansburgh Associates, Inc.
There will be interviews for the Frolio Middle School, Abington, MA at the Tuesday, January 22, 2013 DSP meeting.
Lunenburg, MA – Lunenburg High School
Applications review at the January 8, 2013 DSP meeting resulted in the following unranked list of applicants:
- Ai3 Architects LLC
- Symmes Maini & McKee Associates, Inc.
- Tappé Associates, Inc.
There will be interviews for the Lunenburg High School, Lunenburg, MA at the Tuesday, February 5, 2013 DSP meeting.
There were no informational interviews at this meeting.
DSP Meeting Results:
Meeting Date: December 18, 2012
Boston, MA – Dearborn School
Applications review at the December 18, 2012 DSP meeting resulted in the following unranked list of applicants:
- Jonathan Levi Architects LLC
- Leers Weinzapfel Associates Architects, Inc.
- Symmes Maini & McKee Associates, Inc.
There will be interviews for the Dearborn School, Boston, MA at the Tuesday, January 8, 2013 DSP meeting.
There were no informational interviews at this meeting.
DSP Meeting Results:
Meeting Date: October 16, 2012
Athol-Royalston Regional School District – Riverbend Elementary School
Applications review at the October 2, 2012 DSP meeting and finalist interviews at the October 16, 2012 DSP meeting resulted in the following ranking of applicants:
- Mount Vernon Group Architects, Inc.
- Flansburgh Associates, Inc.
- OMR Architects, Inc.
There were no informational interviews at this meeting.
DSP Meeting Results:
Meeting Date: October 2, 2012
Newton, MA – A.E. Angier Elementary School
Applications review at the September 18, 2012 DSP meeting and finalist interviews at the October 2, 2012 DSP meeting resulted in the following ranking of applicants:
- DiNisco Design Partnership, Limited
- HMFH Architects, Inc.
- Mount Vernon Group Architects, Inc. (as determined at the September 18, 2012 DSP meeting)
Athol-Royalston Regional School District – Riverbend Elementary School
Applications review at the October 2, 2012 DSP meeting resulted in the following unranked list of applicants:
- Flansburgh Associates, Inc.
- Mount Vernon Group Architects, Inc.
- OMR Architects, Inc.
There will be interviews for the proposed Riverbend Elementary School, Athol, MA at the Tuesday, October 16, 2012 DSP meeting.
There were no informational interviews at this meeting.
DSP Meeting Results:
Meeting Date: September 18, 2012
Newton – A.E. Angier Elementary School
Applications review at the September 18, 2012 DSP meeting resulted in the following unranked list of applicants:
- DiNisco Design Partnership, Ltd.
- HMFH Architects, Inc.
There will be interviews for the A.E. Angier Elementary School project at the Tuesday, October 2, 2012 meeting.
There were no informational interviews at this meeting.
DSP Meeting Results:
Meeting Date: August 28, 2012
Lynn, MA – Thurgood Marshall Middle School
Applications review at the July 24, 2012 DSP meeting and Finalist Interviews at the August 28, 2012 DSP meeting resulted in the following ranking of applicants:
- Raymond Design Associates, Inc.
- Tappé Associates, Inc.
- Mount Vernon Group Architects, Inc.
DSP Meeting Results:
Meeting Date: July 24, 2012
Lynn, MA – Thurgood Marshall Middle School
Applications review at the July 24, 2012 DSP meeting resulted in the following unranked list of applicants:
- Raymond Design Associates, Inc.
- Tappé Associates, Inc.
There will be interviews for the proposed Thurgood Marshall Middle School project at the Tuesday, August 28, 2012 DSP meeting.
There were informational interviews with the following firms:
- Stantec
- Tai Soo Kim Partners Architects
DSP Meeting Results:
Meeting Date: June 5, 2012
Accelerated Repair Designer Applications Review
Applications review resulted in the following recommendation of applicants for the Accelerated Repair Program:
Roof, Window, and Boiler
CSS Architects, Inc.
DiMarinisi & Wolfe Architects
Habeeb & Associates Architects, Inc.
Icon Architecture, Inc.
Knight, Bagge & Anderson, Inc.
Reinhardt Associates, Inc.
Turowski2 Architecture, Inc.
Roof and Window Only
CBI Consulting, Inc.
Gale Associates, Inc.
Kaestle Boos Associates, Inc.
Raymond Design Associates, Inc.
Russo Barr Associates, Inc.
Boiler Only
BLW Engineers, Inc.
Garcia Galuska DeSousa, Inc.
Lindgren & Sharples, P.C.
RDK Engineers
Shekar & Associates
The MSBA will assign a Designer from one of the above three groups to each Accelerated Repair project. There is no guarantee that a Designer in any of the above three groups will be assigned to any particular number of Accelerated Repair projects or to any Accelerated Repair project at all. The MSBA may assign more than one Accelerated Repair project to a Designer. The grouping and selection of Designers described above is solely for the purposes of the Accelerated Repair Program.
DSP Meeting Results:
Meeting Date: May 22, 2012
Winthrop, MA – Winthrop High School
Applications review at the May 22, 2012 DSP meeting resulted in the following ranking of applicants:
- HMFH Architects, Inc.
- DiNisco Design Partnership, Ltd.
- Flansburgh Associates, Inc.
There were no informational interviews.
DSP Meeting Results:
Meeting Date: May 8, 2012
Science Laboratory Initiative
DSP Meeting Results:
Meeting Date: April 24, 2012
Revere, MA – William McKinley Elementary School
Applications review at the April 24, 2012 DSP meeting resulted in the following ranking of applicants:
- Drummey Rosane Anderson, Inc.
- Flansburgh Associates, Inc.
- JCJ Architecture, PC
There were informational interviews with the following firms:
- Raymond Design Associates, Inc.
- HKT Architects, Inc.
DSP Meeting Results:
Meeting Date: March 27, 2012
Wachusett Regional School District – Mountview Middle School
Applications review at the March 27, 2012 DSP meeting resulted in the following ranking of applicants:
- Lamoureux Pagano & Associates, Inc.
- Flansburgh Associates, Inc.
- Design Partnership of Cambridge, Inc.
There were informational interviews with the following firms:
- LaVallee Brensinger Architects
- Clarke & Green, Inc.
DSP Meeting Results:
Meeting Date: March 13, 2012
Spencer-East Brookfield Regional School District – David Prouty High School
Applications review at the February 28, 2012 DSP meeting and interviews at the March 13, 2012 DSP meeting resulted in the following ranking of applicants:
- Design Partnership of Cambridge, Inc.
- ARC/Architectural Resources Cambridge, Inc.
- Lamoureux Pagano & Associates, Inc. (as determined at the Feb. 28, 2012 DSP meeting)
Berkshire Hills Regional School District – Monument Mountain Regional High School
Applications review at the February 28, 2012 DSP meeting and interviews at the March 13, 2012 resulted in the following ranking of applicants:
- Symmes Maini & McKee Associates, Inc.
- Tetra Tech Architects & Engineers
- Flansburgh Associates, Inc.
DSP Meeting Results:
Meeting Date: February 28, 2012
Chicopee, MA – Chicopee Academy
Applications review at the January 24, 2012 DSP meeting and interviews at the February 28, 2012 DSP meeting resulted in the following ranking of applicants:
- Caolo & Bieniek Associates, Inc.
- Drummey Rosane Anderson, Inc.
- Lamoureux Pagano & Associates, Inc.
Berkshire Hills Regional School District – Monument Mountain Regional High School
Applications review at the February 28, 2012 DSP meeting resulted in the following unranked list of applicants:
- Flansburgh Associates, Inc.
- Symmes Maini & McKee Associates, Inc.
- Tetra Tech Architects & Engineers
There will be interviews for the proposed Monument Mountain Regional High School project at the Tuesday, March 13, 2012 DSP meeting.
Spencer-East Brookfield Regional School District – David Prouty High School
Applications review at the February 28, 2012 DSP meeting resulted in the following unranked list of applicants:
- ARC/Architectural Resources Cambridge, Inc.
- Design Partnership of Cambridge, Inc.
There will be interviews for the proposed David Prouty High School project at the Tuesday, March 13, 2012 DSP meeting.
DSP Meeting Results:
Meeting Date: February 7, 2012
Whitman-Hanson Regional School District – Maquan Elementary School
Applications review at the January 10, 2012 DSP meeting and interviews at the February 7, 2012 DSP meeting resulted in the following ranking of applicants:
- Turowski2 Architecture, Inc.
- Raymond Design Associates, Inc.
- Fletcher Thompson Architecture Engineering, LLC
Winchester, MA – Winchester High School
Applications review at the January 10, 2012 DSP meeting and interviews at the February 7, 2012 DSP meeting resulted in the following ranking of applicants:
- Symmes Maini & McKee Associates, Inc.
- Tappé Associates, Inc.
- Flansburgh Associates, Inc.
There were no informational interviews at this meeting.
DSP Meeting Results:
Meeting Date: January 24, 2012
Auburn, MA – Auburn Middle School
Applications review at the December 20, 2011 DSP meeting and interviews at the January 24, 2012 DSP meeting resulted in the following ranking of applicants:
- Lamoureux Pagano & Associates, Inc.
- OMR Architects, Inc.
- ARC/Architectural Resources Cambridge
Chicopee, MA – Chicopee Academy
Applications review at the January 24, 2012 DSP meeting resulted in the following unranked list of applicants:
- Caolo & Bieniek Associates, Inc.
- Drummey Rosane Anderson, Inc.
- Lamoureux Pagano & Associates, Inc.
There will be interviews for the proposed Chicopee Academy project at the February 28, 2012 DSP meeting.
There were no informational interviews at this meeting.
DSP Meeting Results:
Meeting Date: January 10, 2012
Newburyport, MA – R.A. Nock/E.G. Molin School
Applications review at the December 20, 2011 DSP meeting and interviews at the January 10, 2012 DSP meeting resulted in the following ranking of applicants:
- Miller Dyer Spears, Inc.
- Symmes Maini & McKee Associates, Inc.
- Flansburgh Associates, Inc.
Winchester, MA – Winchester High School
Applications review at the January 10, 2012 DSP meeting resulted in the following unranked list of applicants:
- Symmes Maini & McKee Associates, Inc.
- Tappé Associates, Inc.
There will be interviews for the proposed Winchester High School project at the Tuesday, February 7, 2012 DSP meeting.
Whitman-Hanson Regional School District – Maquan Elementary School
Application review at the January 10, 2012 DSP meeting resulted in the following unranked list of applicants:
- Fletcher Thompson Architecture Engineering, LLC
- Raymond Design Associates, Inc.
- Turowski2 Architecture, Inc.
There will be interviews for the proposed Maquan Elementary School project at the Tuesday, February 7, 2012 DSP meeting.
DSP Meeting Results:
Meeting Date: December 20, 2011
Ayer – Ayer-Shirley Regional Middle/High School
Application review at the December 6, 2011 DSP meeting and interviews at the December 20, 2011 meeting resulted in the following ranking of applicants:
- Symmes Maini & McKee Associates, Inc.
- Design Partnership of Cambridge, Inc.
- Flansburgh Associates, Inc.
Newburyport – R.A. Nock/E.G. Molin School
Application review at the December 20, 2011 DSP meeting resulted in the following unranked list of applicants:
- Miller Dyer Spears, Inc.
- Symmes Maini & McKee Associates, Inc.
There will be interviews for the R.A. Nock/E.G. Molin School at the next scheduled DSP meeting on Tuesday, January 10, 2012.
Auburn – Auburn Middle School
Application review at the December 20, 2011 DSP meeting resulted in the following unranked list of applicants:
- ARC/Architectural Resources Cambridge
- Lamoureux Pagano & Associates, Inc.
- OMR Architects, Inc.
There will be interviews for the Auburn Middle School at the Tuesday, January 24, 2012 DSP meeting.
There were no informational interviews at this meeting.
DSP Meeting Results:
Meeting Date: December 6, 2011
Tyngsboro – Greater Lowell Technical High School
Application review at the December 6, 2011 DSP meeting resulted in the following ranking of applicants:
- Knight, Bagge & Anderson, Inc.
- Kaestle Boos Associates, Inc.
- Lamoureaux, Pagano & Associates, Inc.
There will not be interviews for this project.
Ayer-Shirley Regional School District – Ayer-Shirley Regional Middle High School
Application review at the December 6, 2011 DSP meeting resulted in the following unranked list of applicants:
- Design Partnership of Cambridge, Inc.
- Flansburgh Associates, Inc.
- Symmes Maini & McKee Associates, Inc.
There will be interviews for the Ayer-Shirley Regional Middle High School at the next scheduled DSP meeting on December 20, 2011.
DSP Meeting Results:
Meeting Date: November 22, 2011
South Hadley – Plains Elementary School
Application review at the November 8, 2011 meeting and interviews at the November 22, 2011 meeting resulted in the following ranking of applicants:
- Margo Jones Architects, Inc.
- Flansburgh Associates, Inc.
- Design Partnership of Cambridge, Inc.
There were no informational interviews at this meeting.
DSP Meeting Results:
Meeting Date: November 8, 2011
South Hadley – Plains Elementary School
Application review at the November 8, 2011 DSP meeting resulted in the following unranked list of applicants:
- Design Partnership of Cambridge, Inc.
- Flansburgh Associates, Inc.
- Margo Jones Architects, Inc.
Interviews for the Plains Elementary School will be held at the next DSP meeting on Tuesday, November 22, 2011.
There were informational interviews with the following firms at this meeting:
- Fitzmeyer & Tocci Associates, Inc.
- New Vista Designs
- id3A, LLC
DSP Meeting Results:
Meeting Date: October 4, 2011
Greater New Bedford Regional Vocational Technical High School
Application review at the September 20, 2011 DSP meeting and interviews at the October 4, 2011 DSP meeting resulted in the following ranking of applicants:
- Drummey Rosane Anderson, Inc.
- Kaestle Boos Associates, Inc.
- Miller Dyer Spears, Inc.
Boston – Quincy Upper School
Application review at the October 4, 2011 DSP meeting resulted in the following ranking of applicants:
- HMFH Architects, Inc.
- Finegold Alexander and Associates, Inc.
- Fletcher Thompson Architecture Engineering, LLC
There were no informational interviews at this meeting.
DSP Meeting Results:
Meeting Date: September 20, 2011
Greater New Bedford Regional Vocational Technical High School
Application review at the September 20, 2011 DSP meeting resulted in the following unranked list of applicants:
- Drummey Rosane Anderson, Inc.
- Kaestle Boos Associates, Inc.
There were informational interviews with the following firms at this meeting:
- ARC/Architectural Resources Cambridge
Interviews for the Greater New Bedford Regional Vocational Technical High School will be held at the next DSP meeting on Tuesday, October 4, 2011.
DSP Meeting Results:
Meeting Date: September 13, 2011
Lexington – Joseph Estabrook Elementary School
Application review at the August 23, 2011 DSP meeting and interviews at the September 13, 2011 DSP meeting resulted in the following ranking of applicants:
- DiNisco Design Partnership, Limited
- Symmes Maini & McKee Associates, Inc.
- Mount Vernon Group Architects, Inc.
There were informational interviews with the following firms at this meeting:
- Cambridge Seven Associates, Inc.
- SAR Engineering, Inc.
DSP Meeting Results:
Meeting Date: August 23, 2011
West Bridgewater – Middle-Senior High School
Application review at the August 2, 2011 DSP meeting and the interviews at the August 23, 2011 DSP meeting resulted in the following ranking of applicants:
- Flansburgh Associates, Inc.
- Design Partnership of Cambridge, Inc.
- Finegold Alexander and Associates, Inc.
- HMFH Architects, Inc.
Lexington – Joseph Estabrook Elementary School
Application review at the August 23, 2011 DSP meeting resulted in the following unranked list of applicants:
- DiNisco Design Partnership, Limited
- Symmes Maini & McKee Associates, Inc.
Interviews for the Lexington Joseph Estabrook Elementary School will be held at the next DSP meeting on Tuesday, September 13, 2011.
Webster – Park Avenue Elementary School
Application review at the August 23, 2011 DSP meeting resulted in the following ranking of applicants:
- Dore & Whittier Architects, Inc.
- Taylor & Burns, Inc.
- Kaestle Boos Associates, Inc.
There were no informational interviews at this meeting.
DSP Meeting Results:
Meeting Date: August 2, 2011
West Bridgewater – Middle-Senior High School
Application review at the August 2, 2011 DSP meeting resulted in the following unranked list of applicants:
- Design Partnership of Cambridge, Inc.
- Finegold Alexander and Associates, Inc.
- Flansburgh Associates, Inc.
- HMFH Architects, Inc.
The interviews for the West Bridgewater Middle-Senior High School project will be held at the next DSP meeting on Tuesday, August 23, 2011.
There were also informational interviews with the following firms:
- BVH Integrated Services
- Taylor & Burns, Inc.
- The Arch Professional Group, Inc.
DSP Meeting Results:
Meeting Date: July 19, 2011
Wakefield – Galvin Middle School
Application review at the July 19, 2011 DSP meeting resulted in the following ranking of applicants:
- Tappé Associates, Inc.
- Drummey Rosane Anderson, Inc.
- Mount Vernon Group Architects, Inc.
Georgetown – Penn Brook School
Application review at the July 19, 2011 DSP meeting resulted in the following ranking of applicants:
- Drummey Rosane Anderson, Inc.
- Flansburgh Associates, Inc.
- Dore & Whittier Architects, Inc.
There were also informational interviews with the following firms:
- Schwartz/Silver Architects, Inc.
- The S/L/A/M Collaborative, Inc.
DSP Meeting Results:
Meeting Date: April 19, 2011
North Reading – North Reading Middle/High School
Application review at the April 19, 2011 DSP meeting resulted in the following ranking of applicants:
- Dore & Whittier Architects, Inc.
- Flansburgh Associates, Inc.
- Tappé Associates, Inc.
There were also informational interviews with the following firms:
- Perry Dean Rogers & Partners Architects, Inc.
- Lindgren & Sharples, P.C.
Meeting Date: March 15, 2011
Peabody – Higgins Middle School
Application review at the February 15, 2011 DSP meeting and finalist interviews at the March 15, 2011 DSP meeting resulted in the following ranking of applicants:
1. DiNisco Design Partnership, Limited
2. Mount Vernon Group Architects, Inc.
3. Kaestle Boos Associates, Inc.
Greenfield – Greenfield High School
Applications review at the March 15, 2011 DSP meeting resulted in the following ranking of applicants:
1. Dore & Whittier Architects, Inc.
2. Symmes Maini & McKee Associates, Inc.
3. The S/L/A/M Collaborative
There were no informational interviews at this meeting.
Meeting Date: March 1, 2011
Stoneham – Stoneham Middle School
Application review at the February 15, 2011 DSP meeting and interviews at the March 1, 2011 DSP meeting resulted in the following ranking of applicants:
- Tappé Associates, Inc.
- Drummey Rosane Anderson, Inc.
- Mount Vernon Group Architects, Inc. and Raymond Design Associates, Inc. (tied)
Williamsburg – Ann T. Dunphy School
Application review at the March 1, 2011 DSP meeting resulted in the following ranking of applicants:
- Drummey Rosane Anderson, Inc.
- JCJ Architecture, PC
- Fletcher Thompson Architecture Engineering, LLC
There were no informational interviews at this meeting.
Meeting Date: February 15, 2011
Concord-Carlisle - Concord-Carlisle High School
Application review at the February 15, 2011 DSP meeting resulted in the following ranking of applicants:
- OMR Architects, Inc.
- Lavallee Brensinger Architects
- ARCADD, Inc.
Wilmington – Wilmington High School
Application review at the February 15, 2011 DSP meeting resulted in the following ranking of applicants:
- Dore & Whittier Architects, Inc.
- Symmes Maini & McKee Associates, Inc.
- Flansburgh Associates, Inc.
Peabody – J. Henry Higgins Middle School
Application review at the February 15, 2011 DSP meeting resulted in the following unranked list:
- DiNisco Design Partnership, Limited
- Kaestle Boos Associates, Inc.
- Mount Vernon Group Architects, Inc.
Interviews for the Peabody Higgins Middle School project have not yet been scheduled.
Stoneham – Stoneham Middle School
Application review at the February 15, 2011 DSP meeting resulted in the following unranked list:
- Drummey Rosane Anderson, Inc.
- Tappé Associates, Inc.
Interviews for the Stoneham Middle School project have not yet been scheduled.
There were no informational interviews at this meeting.
Meeting Date: January 11, 2011
Lincoln - Lincoln School
Application review at the December 7, 2010 DSP meeting and interviews at the January 11, 2011 DSP meeting resulted in the following ranking of applicants:
- OMR Architects, Inc.
- Symmes Maini McKee Associates, Inc.
Saugus - Belmonte Middle School
Application review and interviews at the January 11, 2011 DSP meeting resulted in the following ranking of applicants:
- Fletcher Thompson Architecture Engineering, LLC
- Mount Vernon Group Architects, Inc.
There were no informational interviews at this meeting.
DSP Meeting Results:
Meeting Date: July 19, 2011
Meeting Date: December 21, 2010
Norton – Norton High School
Application review at the December 7, 2010 DSP meeting and interviews at the December 21, 2010 DSP meeting resulted in the following ranking of applicants:
- JCJ Architecture, PC
- Kaestle Boos Associates, Inc.
There were no informational interviews at this meeting.
Meeting Date: December 7, 2010
Lincoln – Lincoln School
Application review at the December 7, 2010 DSP meeting resulted in the following unranked list:
- OMR Architects, Inc.
- Symmes Maini & McKee Associates, Inc.
Interviews for this project will take place on Tuesday, January 11, 2011.
Norton – Norton High School
Application review at the December 7, 2010 DSP meeting resulted in the following unranked list:
- JCJ Architecture, PC
- Kaestle Boos Associates, Inc.
Interviews for this project will take place on Tuesday, December 21, 2010.
There were informational interviews with the following firms at this meeting:
- Eck MacNeely Architects Inc.
- Mount Vernon Group Architects, Inc.
Meeting Date: November 16, 2010
Springfield - Forest Park Middle School
Application review at the October 19, 2010 DSP meeting and interviews at the November 16, 2010 DSP meeting resulted in the following ranking of applicants:
- Perkins Eastman
- Drummey Rosane Anderson, Inc.
- Symmes Maini & McKee Associates, Inc.
There were informational interviews with the following firms at this meeting:
- Cannon Boston, Inc. and affiliates d/b/a Cannon Design
- HMFH Architects, Inc.
The next DSP meeting will be held on December 7, 2010.
Meeting Date: November 2, 2010
Meeting Date: October 19, 2010
- Kaestle Boos Associates, Inc.
- Maryann Thompson Architects
- Miller Dyer Spears, Inc.
- Arrowstreet, Inc.
- Perkins Eastman
- Drummey Rosane Anderson, Inc.
Meeting Date: October 5, 2010
- Dore & Whittier Architects, Inc.
- Flansburgh Associates, Inc.
- Jonathan Levi Architects LLC
Meeting Date: September 21, 2010
- Fletcher Thompson Architecture Engineering, LLC
- Kaestle Boos Associates, Inc.
- Kao Design Group, Inc.
- Gale Associates, Inc.
- Tetra Tech, Inc.
Meeting Date: September 7, 2010
- Miller Dyer Spears, Inc.
- Habeeb & Associates Architects, Inc.
- Dietz & Company Architects, Inc.
Meeting Date: July 27, 2010
Meeting Date: July 13, 2010
- CGKV Architects, Inc.
- Design Partnership of Cambridge, Inc.
- Flansburgh Associates, Inc.
- Kaestle Boos Associates, Inc.
- Bechtel Frank Erickson Architects, Inc.
- The Robinson Green Beretta Corporation
- Hesnor Engineering Company
Meeting Date: June 29, 2010
- JCJ Architecture + Interiors, PC
- CGKV Architects, Inc.
- Margo Jones Architects, Inc.
- Baker/Wohl Architects, Inc.
- Bradley Architects, Inc.
- Cannon Boston, Inc. dba Cannon Design
- CGKV Architects, Inc.
- CSS Architects Incorporated
- DiMarinisi & Wolfe Architects Urban Design
- Durland Van Voorhis Architects, Inc.
- Habeeb & Associates Architects, Inc.
- ICON architecture, inc.
- Knight, Bagge & Anderson, Inc.
- LPBA/Architects, Inc.
- Reinhardt Associates, Inc.
- Tighe & Bond, Inc.
- Turowski2 Architecture, Inc.
- BLW Engineers, Inc.
- BVH Integrated Services, Inc.
- Hesnor Engineering Company
- Richard D. Kimball Company, Inc.
- SED Associates Corp.
- Gale Associates, Inc.
- Russo Barr Associates, Inc.
Meeting Date: June 15, 2010
- Turowski2 Architecture, Inc.
- Drummey Rosane Anderson, Inc.
- Kaestle Boos Associates, Inc.
- CGKV Architects, Inc.
- JCJ Architecture + Interiors, PC
- Margo Jones Architects, Inc.
- XChange Architects
- Studio G Architects
- The Gluck Architectural Collaborative, PC dba Peter Gluck and Partners
Meeting Date: Tuesday, May 18, 2010
- DiNisco Design Partnership, Ltd.
- Kaestle Boos Associates, Inc.
- Taylor & Burns, Inc.
Meeting Date: Tuesday, May 4, 2010
- Ai3 Architects, LLC
- CGKV Architects, Inc.
- Kaestle Boos Associates, Inc.
- DiNisco Design Partnership, Limited
- Kaestle Boos Associates, Inc.
- Lamoureux Pagano Associates, Inc.
- Taylor & Burns, Inc.
- Knight, Bagge & Anderson, Inc.
- Mount Vernon Group Architects, Inc.
- TLCR Associates, Inc.
Meeting Date: Tuesday, April 6, 2010
- Ai3 Architects, LLC
- Kaestle Boos Associates, Inc.
- CGKV Architects, Inc.
- Durkee, Brown, Viveiros & Werenfels Architects
- The Architectural Team, Inc.
- Fletcher Thompson Architecture Engineering, LLC.
Meeting Date: Tuesday, March 16, 2010
- HMFH Architects, Inc.
- DiNisco Design Partnership, Limited
- Dore and Whittier Architects, Inc.
There were no informational interviews.
Meeting Date: Tuesday, February 16, 2010
- DiNisco Design Partnership, Limited
- Dore & Whittier Architects, Inc.
- HMFH Architects, Inc.
- Turowski2 Architecture, Inc.
- Perkins Eastman
- Maguire Group Inc.
Meeting Date: Tuesday, February 2, 2010
Meeting Date: Tuesday, January 12, 2010
- Finegold Alexander and Associates, Inc.
- Flansburgh Associates, Inc.
- Mount Vernon Group Architects, Inc.
- The Office of Michael Rosenfeld, Inc.
- Kaestle Boos Associates, Inc.